Block 0132, lot 046
566 Vallejo St
- City’s use
- Multi-Family Residential
- Built
- 1955
- Stories
- 3
- Units
- 29
- Rooms
- 29 bathrooms
- Building
- 18,369 sq ft
- Lot
- 12,993 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 14, 2024 | Completed final sign-off Apr 2025 | 566 Vallejo St | San Francisco Fire Protection | bldg 2 (west): new fire control panel will be installed. install lf sounders in all bedroom and living rooms to comply with sffc 1103.7.6.1 for potential sleeping areas. install new facu, rps, aes comm horn strobes, lf sounders, manual pulls, smoke detectors and heat detectors.Details
bldg 2 (west): new fire control panel will be installed. install lf sounders in all bedroom and living rooms to comply with sffc 1103.7.6.1 for potential sleeping areas. install new facu, rps, aes comm horn strobes, lf sounders, manual pulls, smoke detectors and heat detectors. | |
| Jan 25, 2024 | Completed final sign-off Apr 2025 | 566 Vallejo St | San Francisco Fire Protection | new fire alarm control panels w/ rps for bldg #2. lf sounders in all bedroom and living rooms to comply w/ 1103.7.6.1 for potential sleeping areas. install rps, aes comm, horn strobes, lf sounders, manual pulls and smoke detectors. install heat detectorsDetails
new fire alarm control panels w/ rps for bldg #2. lf sounders in all bedroom and living rooms to comply w/ 1103.7.6.1 for potential sleeping areas. install rps, aes comm, horn strobes, lf sounders, manual pulls and smoke detectors. install heat detectors | $30,000 |
| Jun 27, 2023 | Never finaled issued Jun 2023, no final | 566 Vallejo St | repair dry rotted siding end damaged plaster. erect scaffold for access. west building south side. not visible from street; repair in kind.Details
repair dry rotted siding end damaged plaster. erect scaffold for access. west building south side. not visible from street; repair in kind. | $6,000 | |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 566 Vallejo St | apt 33: one kitchen and one bathroom remodel. all work in-kind and no layout changes. non structuralDetails
apt 33: one kitchen and one bathroom remodel. all work in-kind and no layout changes. non structural | $40,000 | |
| May 18, 2022 | Completed final sign-off Oct 2022 | 566 Vallejo St | apt #18: one remodel kitchen & one bathroom. new electrical panel,plumbing as needed. no change to floor plan. including heat-pump, a/c subs to pull own permits.Details
apt #18: one remodel kitchen & one bathroom. new electrical panel,plumbing as needed. no change to floor plan. including heat-pump, a/c subs to pull own permits. | $20,000 | |
| Jun 18, 2021 | Completed final sign-off Feb 2022 | 566 Vallejo St | unit #38: kitchen bathroom remodel. includes nw electrical panel and repiping of plumbing as needed. no change to floor plan or locations. includes replacement of 4 windows (1 in kitchen, 1 in bath, 1 bedroom, & 1 in living) not visibel from street. nw heat pump ac. done by subcontractorsDetails
unit #38: kitchen bathroom remodel. includes nw electrical panel and repiping of plumbing as needed. no change to floor plan or locations. includes replacement of 4 windows (1 in kitchen, 1 in bath, 1 bedroom, & 1 in living) not visibel from street. nw heat pump ac. done by subcontractors | $34,000 | |
| Jun 18, 2021 | Completed final sign-off Feb 2022 | 566 Vallejo St | unit #28: kitchen bathroom remodel. includes nw electrical panel and repiping of plumbing as needed. no change to floor plan or locations. includes replacement of 4 windows (1 in kitchen, 1 in bath, 1 bedroom, & 1 in living) not visibel from street. nw heat pump ac. done by subcontractorsDetails
unit #28: kitchen bathroom remodel. includes nw electrical panel and repiping of plumbing as needed. no change to floor plan or locations. includes replacement of 4 windows (1 in kitchen, 1 in bath, 1 bedroom, & 1 in living) not visibel from street. nw heat pump ac. done by subcontractors | $34,000 | |
| Apr 26, 2021 | Completed final sign-off Feb 2022 | 566 Vallejo St | west bldg - unit # 36 -kitchen & bath remodel: (n) electrical panel, repiping plumbing as needed. no change to locations. also replacement of 4 windows not street facing & (n) electric heat pump ac. sub contractors to pull own permits.Details
west bldg - unit # 36 -kitchen & bath remodel: (n) electrical panel, repiping plumbing as needed. no change to locations. also replacement of 4 windows not street facing & (n) electric heat pump ac. sub contractors to pull own permits. | $34,000 | |
| Apr 26, 2021 | Completed final sign-off Feb 2022 | 566 Vallejo St | west bldg - unit # 24-kitchen & bath remodel: (n) electrical panel, repiping plumbing as needed. no change to locations. also replacement of 4 windows not street facing & (n) electric heat pump ac. sub contractors to pull own permits.Details
west bldg - unit # 24-kitchen & bath remodel: (n) electrical panel, repiping plumbing as needed. no change to locations. also replacement of 4 windows not street facing & (n) electric heat pump ac. sub contractors to pull own permits. | $34,000 | |
| Nov 13, 2020 | Completed final sign-off Feb 2022 | 566 Vallejo St | unit 11: remodel kitchen and bathroom. replace window in kind. install new electrical panel. 4 windows total, 2 in kitchen, 1 in bedroom & 1 slider in living room. remove pantry closet. no other wall removals.Details
unit 11: remodel kitchen and bathroom. replace window in kind. install new electrical panel. 4 windows total, 2 in kitchen, 1 in bedroom & 1 slider in living room. remove pantry closet. no other wall removals. | $10,000 | |
| Nov 9, 2020 | Completed final sign-off Feb 2022 | 566 Vallejo St | unit #27: remodel kitchen and bathroom. scope includes location and replacement of electrical panel. removal of small closet partition wall, non-bearing. subs to pull their own permitsDetails
unit #27: remodel kitchen and bathroom. scope includes location and replacement of electrical panel. removal of small closet partition wall, non-bearing. subs to pull their own permits | $10,000 | |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 566 Vallejo St | Tabernus Service Company | kitchen and bath remodel. remove and replace like for like.Details
kitchen and bath remodel. remove and replace like for like. | $45,000 |
| Jan 27, 2017 | Completed final sign-off Apr 2017 | 566 Vallejo St | Tabernus Service Company | remove and replace. repair stairs and landings o stairwell. exterior, less than 50%Details
remove and replace. repair stairs and landings o stairwell. exterior, less than 50% | |
| Jan 13, 2016 | Completed final sign-off Nov 2016 | 566 Vallejo St | (building #2, east) soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4.Details
(building #2, east) soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. | $75,000 | |
| Jan 13, 2016 | Completed final sign-off Nov 2016 | 566 Vallejo St | (building #1, west) soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4.Details
(building #1, west) soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. | $75,000 | |
| Oct 20, 2015 | Expired or cancelled cancelled Jan 2026 | 566 Vallejo St | east bldg:soft story retrofit per 16-13. 2012 iebc appendix a-4Details
east bldg:soft story retrofit per 16-13. 2012 iebc appendix a-4 | $75,000 | |
| Oct 20, 2015 | Expired or cancelled cancelled Jan 2026 | 566 Vallejo St | west bldg: soft story retrofit per 16-13. 2012 iebc appendix a-4Details
west bldg: soft story retrofit per 16-13. 2012 iebc appendix a-4 | $75,000 | |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 566 Vallejo St | Make Ready Maintenance Inc | street spaceDetails
street space | |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 566 Vallejo St | Make Ready Maintenance Inc | street spaceDetails
street space | |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 566 Vallejo St | Make Ready Maintenance Inc | unit #29: kitchen and bath remodel. no windows or structuralDetails
unit #29: kitchen and bath remodel. no windows or structural | $27,000 |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 566 Vallejo St | Make Ready Maintenance Inc | unit # 35: kitchen ad bathroom remodel. no windows or structuralDetails
unit # 35: kitchen ad bathroom remodel. no windows or structural | $27,000 |
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 566 Vallejo St | Master Roofing Systems Inc. | reroofingDetails
reroofing | $28,000 |
| Dec 28, 2005 | Never finaled issued Dec 2005, no final | 566 Vallejo St | Doherty Painting & Constr | east stairs: at 2 location remove section of dry rotted 4"x4" post and replace with new 4"x4" pt post/west stairs: at 2 locations remove section of dry rotted 4"x4" post and replace with new 4"x4" ptDetails
east stairs: at 2 location remove section of dry rotted 4"x4" post and replace with new 4"x4" pt post/west stairs: at 2 locations remove section of dry rotted 4"x4" post and replace with new 4"x4" pt | $1,400 |
| May 4, 2001 | Expired or cancelled expired Nov 2001 | 566 Vallejo St | replace rotting wood on stairs & decksDetails
replace rotting wood on stairs & decks | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Make Ready Maintenance Inc (4), San Francisco Fire Protection (2), Tabernus Service Company (2), Doherty Painting & Constr, Master Roofing Systems Inc.
- Engineers
- Brent Hanlon (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.