Block 0130, lot 009
1415 Stockton St
- City’s use
- Commercial Hotel
- Built
- 1906
- Stories
- 3
- Units
- 6
- Rooms
- 4 bathrooms
- Building
- 15,950 sq ft
- Lot
- 5,882 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 14, 2020 | Expired or cancelled cancelled Aug 2022 | 1415 Stockton St | Giuseppe Pennisi | ti: retail fish store in (e) retail space. (n) handicap counter/display counter.Details
ti: retail fish store in (e) retail space. (n) handicap counter/display counter. | $10,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 1415 Stockton St | street spaceDetails
street space | ||
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 1411 Stockton St | street spaceDetails
street space | ||
| Mar 7, 2018 | Never finaled issued Apr 2018, no final | 1415 Stockton St | replace (e) concrete basement wall approx 22'-0" at south side of basementDetails
replace (e) concrete basement wall approx 22'-0" at south side of basement | $65,000 | |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 1419 Stockton St | Design Max Construction | to comply with nov# 201602157, 1)cosmetic work: interior wall painting. 2)install dancing pole less than 40 occupancyDetails
to comply with nov# 201602157, 1)cosmetic work: interior wall painting. 2)install dancing pole less than 40 occupancy | $4,000 |
| Jul 29, 2014 | Completed final sign-off Jun 2015 | 1415 Stockton St | Fay Tat Construction Co | volunteer strenghtening upgrade (e) building: install one steel frame in (e) building and shear collectors. add handdicap restroom. install shear wall. install two drill piers foundation.Details
volunteer strenghtening upgrade (e) building: install one steel frame in (e) building and shear collectors. add handdicap restroom. install shear wall. install two drill piers foundation. | $25,000 |
| Jun 6, 2014 | Completed final sign-off Jul 2014 | 1411 Stockton St | Fay Tat Construction Co | correct violation complaint #201468812. install grab bars at 2/f men & women shower & toilet stall. install grab bars at 3/f men & women shower & toilet stall. total 4 shower rooms & 4 toilet stalls.Details
correct violation complaint #201468812. install grab bars at 2/f men & women shower & toilet stall. install grab bars at 3/f men & women shower & toilet stall. total 4 shower rooms & 4 toilet stalls. | $3,000 |
| Sep 20, 2012 | Completed final sign-off Oct 2013 | 1431 Stockton St | J B M Construction | voluntary seismic upgrade of (e) building, install 1 steel moment frame at inside of building. install 1 ada comply restroom on ground floor & install 2 drilled pier footingsDetails
voluntary seismic upgrade of (e) building, install 1 steel moment frame at inside of building. install 1 ada comply restroom on ground floor & install 2 drilled pier footings | $30,000 |
| Apr 17, 2012 | Completed final sign-off Aug 2012 | 1419 Stockton St | J B M Construction | install two steel frames in (e) bldg and shear collectors. modify the front entrance at ground floor. install 4-drill piers foundations. phase one of three- no exterior work.Details
install two steel frames in (e) bldg and shear collectors. modify the front entrance at ground floor. install 4-drill piers foundations. phase one of three- no exterior work. | $45,000 |
| Oct 28, 2009 | Never finaled issued Oct 2009, no final | 1411 Stockton St | Grace Roofing & Construction | reroofingDetails
reroofing | $26,000 |
| Apr 2, 2009 | Never finaled issued Apr 2009, no final | 1419 Stockton St | street space permit only.Details
street space permit only. | ||
| Jan 8, 2009 | Never finaled issued Jan 2009, no final | 1429 Stockton St | J K M Fire Protection | upgrade (e) ansul to ul300 ansul. wet chem system for commercial kitchen hood & duct.Details
upgrade (e) ansul to ul300 ansul. wet chem system for commercial kitchen hood & duct. | $2,500 |
| Apr 9, 2003 | Never finaled issued Apr 2003, no final | 1411 Stockton St | street space for scaffoldingDetails
street space for scaffolding | ||
| Jun 5, 2002 | Expired or cancelled expired Oct 2002 | 1411 Stockton St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.