Block 0119, lot 001
1753 Mason St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 4
- Units
- 15
- Rooms
- 14 bathrooms
- Building
- 9,350 sq ft
- Lot
- 3,088 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2024 | Completed final sign-off May 2025 | 1753 Mason St | Halyard Inc | unit 1775- renovation on second level to include (n) bedroom, kitchen, cabinets, and plumbing fixtures. (n) washer and dryer and dishwasher, lighting @ (e) j-boxes. no change to mechanical. no exterior work or fire alarm/sprinkler work. no structural workDetails
unit 1775- renovation on second level to include (n) bedroom, kitchen, cabinets, and plumbing fixtures. (n) washer and dryer and dishwasher, lighting @ (e) j-boxes. no change to mechanical. no exterior work or fire alarm/sprinkler work. no structural work | $65,000 |
| Dec 7, 2022 | Expired or cancelled cancelled Jan 2026 | 801 Union St | to comply with abe program per ord 51-16 upgrade (e) commercial entry. abe 2018-1217-3053Details
to comply with abe program per ord 51-16 upgrade (e) commercial entry. abe 2018-1217-3053 | $3,000 | |
| Mar 17, 2021 | Completed final sign-off Aug 2021 | 1753 Mason St | B-Side Inc. | unit 1753: rehab bathroom. no structural work. rehab kitchen. no moving walls. replace washer/dryerDetails
unit 1753: rehab bathroom. no structural work. rehab kitchen. no moving walls. replace washer/dryer | $25,000 |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 1753 Mason St | Doherty Restoration, Inc. | (residential) revision to pa #2019-0215-3040: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall t ofoundation detail at grid f/1-1.8 and grid e.6 to match field condition.Details
(residential) revision to pa #2019-0215-3040: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall t ofoundation detail at grid f/1-1.8 and grid e.6 to match field condition. | |
| Sep 26, 2020 | Completed final sign-off Mar 2021 | 801 Union St | Doherty Restoration, Inc. | (commercial) revision to pa #2019-0215-3043: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall to foundation detail at grid f/1-1.8 and grid e.6 to match field condition.Details
(commercial) revision to pa #2019-0215-3043: revise grade beam at mf1 & mf2. keep posting at grid b. revise shearwall to foundation detail at grid f/1-1.8 and grid e.6 to match field condition. | |
| Jul 24, 2020 | Never finaled issued Jul 2020, no final | 1753 Mason St | steet spaceDetails
steet space | ||
| Feb 15, 2019 | Completed final sign-off Mar 2021 | 801 Union St | Doherty Restoration, Inc. | commercial - soft sotry retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201902153040. to comply with nov 201803408Details
commercial - soft sotry retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201902153040. to comply with nov 201803408 | $18,560 |
| Feb 15, 2019 | Completed final sign-off Mar 2021 | 1753 Mason St | Doherty Restoration, Inc. | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa 201902153043. to comply with nov 201803408Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa 201902153043. to comply with nov 201803408 | $126,440 |
| Mar 16, 2017 | Completed final sign-off Dec 2017 | 1753 Mason St | Rain Defense | reroofingDetails
reroofing | $48,400 |
| Oct 26, 2015 | Never finaled issued Oct 2015, no final | 1773 Mason St | B-Side Inc. | kitchen cabinets and counter replacement. bathroom vanity and shower valve replacement. no walls moved, removed, added or infilled in either room. no floor work in either room.Details
kitchen cabinets and counter replacement. bathroom vanity and shower valve replacement. no walls moved, removed, added or infilled in either room. no floor work in either room. | $5,000 |
| Apr 20, 2012 | Never finaled issued Apr 2012, no final | 1753 Mason St | street space permitDetails
street space permit | ||
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 1771 Mason St | Eagle Ridge Construction And Roofing | change kitchen cabinets, countertops, like for like kind plumbing and electrical fixture upgrade. change bathroom vanity, toilet, tub & surround. new lighting per cec 150(k), no change to exhaust system.Details
change kitchen cabinets, countertops, like for like kind plumbing and electrical fixture upgrade. change bathroom vanity, toilet, tub & surround. new lighting per cec 150(k), no change to exhaust system. | $5,000 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 1759 Mason St | Eagle Ridge Construction And Roofing | remodel kitchen with new cabinets, countertop, like for like plumbing and electrical upgrade. change bathroom vanity, toilet, tub & surround. new lighting per cec 150(k), no change to exhaust system.Details
remodel kitchen with new cabinets, countertop, like for like plumbing and electrical upgrade. change bathroom vanity, toilet, tub & surround. new lighting per cec 150(k), no change to exhaust system. | $5,000 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 1777 Mason St | Eagle Ridge Construction And Roofing | change kitchen cabinets, countertops like for liking plumbing & electrical upgrades. change bathroom vanity, toilet, tub & surrond.Details
change kitchen cabinets, countertops like for liking plumbing & electrical upgrades. change bathroom vanity, toilet, tub & surrond. | $23,000 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 1757 Mason St | Eagle Ridge Construction And Roofing | change kitchen cabinets, countertops, like for like plumbing and electrical upgrades. change bathroom vanity, toilet, tub & suround. jnew lighting epr cec 150(k), no change to exhaust system.Details
change kitchen cabinets, countertops, like for like plumbing and electrical upgrades. change bathroom vanity, toilet, tub & suround. jnew lighting epr cec 150(k), no change to exhaust system. | $5,000 |
| Apr 21, 2003 | Completed final sign-off Jun 2003 | 1753 Mason St | D Cappelletti & Sons Inc | repair rear stair landings & railings less than 50% replacementDetails
repair rear stair landings & railings less than 50% replacement | $9,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Doherty Restoration, Inc. (4), Eagle Ridge Construction And Roofing (4), B-Side Inc. (2), D Cappelletti & Sons Inc, Halyard Inc, Rain Defense
- Architects
- Louis Felthouse (2), Serina Calhoun
- Engineers
- Joe Kon (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.