Block 0095, lot 025
1275 Greenwich St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 6
- Units
- 13
- Rooms
- 36 bathrooms
- Building
- 31,100 sq ft
- Lot
- 10,088 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2024 | Completed final sign-off Aug 2025 | 1275 Greenwich St | Commercial Fire Protection Llc | as built to pa#: 202110069907. add 120v sprinkler bell to floor plans and equipment legend.Details
as built to pa#: 202110069907. add 120v sprinkler bell to floor plans and equipment legend. | |
| Aug 22, 2024 | Completed final sign-off Aug 2025 | 1275 Greenwich St | Commercial Fire Protection Llc | as built to 202110069907: remove (2) horn strobes on basement floor.Details
as built to 202110069907: remove (2) horn strobes on basement floor. | |
| Oct 6, 2021 | Completed final sign-off Aug 2025 | 1275 Greenwich St | Commercial Fire Protection Inc | install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.Details
install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $71,500 |
| Dec 3, 2018 | Never finaled issued Dec 2018, no final | 1275 Greenwich St | D G M L Construction Inc | unit 604; kitchen remodel, new appliances & fixtures. removal of partial non-load bearing wall.Details
unit 604; kitchen remodel, new appliances & fixtures. removal of partial non-load bearing wall. | $40,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 1275 Greenwich St | Ramon Garcia Roofing | reroofing.Details
reroofing. | $55,000 |
| Jun 30, 2010 | Completed final sign-off Sep 2010 | 1275 Greenwich St | Kerry Mueller Design & Construction | remove & replace hardwood flooring in living rm, dining rm, hallway, install new plywood flooring and sound deadening board, hardwood flooring, new r/8" plywood t&g , no structural workDetails
remove & replace hardwood flooring in living rm, dining rm, hallway, install new plywood flooring and sound deadening board, hardwood flooring, new r/8" plywood t&g , no structural work | $12,000 |
| May 7, 2009 | Never finaled issued May 2009, no final | 1275 Greenwich St | street space only.Details
street space only. | ||
| Feb 26, 2009 | Never finaled issued Feb 2009, no final | 1275 Greenwich St | street space only.Details
street space only. | ||
| Feb 24, 2009 | Completed final sign-off Feb 2010 | 1275 Greenwich St | unit #502 remodel vacant unit-kitchen & 3 bathrooms, repair/patch (e) hardwood floor, replace (e) bath fixtures & wall & floor tile. remove pantry & closet & enlarge ktichen. repalce (e) kitchen apliances, cabinets & counters. winden (e) closet for new laundry. no structural wall.Details
unit #502 remodel vacant unit-kitchen & 3 bathrooms, repair/patch (e) hardwood floor, replace (e) bath fixtures & wall & floor tile. remove pantry & closet & enlarge ktichen. repalce (e) kitchen apliances, cabinets & counters. winden (e) closet for new laundry. no structural wall. | $75,000 | |
| Mar 28, 2007 | Completed final sign-off Nov 2007 | 1275 Greenwich St | unit #102- remodel existing kitchen, remove existing non-bearing closet partitions and replace with new non-bearing partitions. enlarge laundry room & remodel existing 2 bathrooms, close existing door to service corridor.Details
unit #102- remodel existing kitchen, remove existing non-bearing closet partitions and replace with new non-bearing partitions. enlarge laundry room & remodel existing 2 bathrooms, close existing door to service corridor. | $50,000 | |
| Jan 19, 2006 | Never finaled issued Jan 2006, no final | 1275 Greenwich St | street spaceDetails
street space | ||
| Dec 21, 2005 | Never finaled issued Dec 2005, no final | 1275 Greenwich St | streetspaceDetails
streetspace | ||
| Sep 29, 2005 | Completed final sign-off Mar 2006 | 1275 Greenwich St | construction of n site landscaping retaining walls with steel/concrete drilled piers. widen e exterior stairs adjacent to n site wallsDetails
construction of n site landscaping retaining walls with steel/concrete drilled piers. widen e exterior stairs adjacent to n site walls | $15,000 | |
| Aug 3, 2005 | Completed final sign-off May 2006 | 1275 Greenwich St | replace (e) subfloor in all bedrooms, kitchen, breesy-way w/new subfloor. replace all bathroomDetails
replace (e) subfloor in all bedrooms, kitchen, breesy-way w/new subfloor. replace all bathroom | $50,000 | |
| Apr 2, 2002 | Completed final sign-off Feb 2003 | 1275 Greenwich St | Kerry Mueller Design & Construction | kchn remodel and 3 bthrm upgrade in apt. #404Details
kchn remodel and 3 bthrm upgrade in apt. #404 | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Commercial Fire Protection Llc (2), Kerry Mueller Design & Construction (2), Commercial Fire Protection Inc, D G M L Construction Inc, Ramon Garcia Roofing
- Architects
- Gary Gee (3)
- Engineers
- Albert Urrutia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.