Block 0091, lot 047A
62 Valparaiso St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,655 sq ft
- Lot
- 1,380 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2015 | Completed final sign-off Aug 2016 | 62 Valparaiso St | Stroub Construction | revision to 201304023644 to reflect correction on existing dimensin on existing stair. stair shall remain as is. ex non conforming condition per 3404.1 exception 1Details
revision to 201304023644 to reflect correction on existing dimensin on existing stair. stair shall remain as is. ex non conforming condition per 3404.1 exception 1 | |
| May 14, 2015 | Completed final sign-off May 2016 | 62 Valparaiso St | Todd Morris Fire Protection Inc. | nfpa 13d basement and lower level studio only. ref app#201304023644Details
nfpa 13d basement and lower level studio only. ref app#201304023644 | $10,900 |
| Apr 30, 2015 | Completed final sign-off Aug 2016 | 62 Valparaiso St | Stroub Construction | revision to app#201304023644. to remedy field condition discovered, replacing 2'-4" unreinf masonry retaining wall with approx. 4' reinf conc wall; install footing at rat slab and to clarify two operable 3/4 hr fire rated windows.Details
revision to app#201304023644. to remedy field condition discovered, replacing 2'-4" unreinf masonry retaining wall with approx. 4' reinf conc wall; install footing at rat slab and to clarify two operable 3/4 hr fire rated windows. | $18,000 |
| Jul 3, 2013 | Expired or cancelled withdrawn Aug 2016 | 62 Valparaiso St | convert (e) daylight basement into bedroom for existing studio apt. #62a, remodel kitchens to add laundry #62,62a,64, convert closet to toilet room #62.Details
convert (e) daylight basement into bedroom for existing studio apt. #62a, remodel kitchens to add laundry #62,62a,64, convert closet to toilet room #62. | $30,000 | |
| Apr 2, 2013 | Completed final sign-off Aug 2016 | 62 Valparaiso St | Stroub Construction | install roof deck +/- 165 sq ft partially within rear 15' setback area on (e) roof. will re-structure roof joists after approval for use under addendum building permit. roof deck is limited to top unit use only. add new habitable space in basement.Details
install roof deck +/- 165 sq ft partially within rear 15' setback area on (e) roof. will re-structure roof joists after approval for use under addendum building permit. roof deck is limited to top unit use only. add new habitable space in basement. | $10,000 |
| Oct 3, 2006 | Completed final sign-off May 2007 | 62 Valparaiso St | V & M Restoration Inc. | renew pa# 2004/10/18/7066; no previous inspections. (but see pa# 2005/09/12/2585) to comply with nov# 200451274.Details
renew pa# 2004/10/18/7066; no previous inspections. (but see pa# 2005/09/12/2585) to comply with nov# 200451274. | |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 62 Valparaiso St | repair and rebuild(e) rear stair, no change in size and configuratrion, add kenn and cross brace forDetails
repair and rebuild(e) rear stair, no change in size and configuratrion, add kenn and cross brace for | $4,000 | |
| Oct 18, 2004 | Expired or cancelled expired May 2007 | 62 Valparaiso St | V & M Restoration Inc. | repair framing damage caused by fire. replace drywall & flr covering, repair rear landing & siding,Details
repair framing damage caused by fire. replace drywall & flr covering, repair rear landing & siding, | $26,765 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.