Block 0051, lot 008A
91 Water St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,518 sq ft
- Lot
- 2,084 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 91 Water St | Kong's Honest Construction | remove existing kitchen cabinets, countertop & sink and replace with new. replace (e) garbage disposalm electrical outlets & gas shut off valve and replace with new.Details
remove existing kitchen cabinets, countertop & sink and replace with new. replace (e) garbage disposalm electrical outlets & gas shut off valve and replace with new. | $18,000 |
| Aug 16, 2018 | Never finaled filed Aug 2018, never issued | 91 Water St | kitchen remodel. cabinets, counterop, sink, garbage disposal, elec, gas shut off valveDetails
kitchen remodel. cabinets, counterop, sink, garbage disposal, elec, gas shut off valve | $18,000 | |
| Apr 25, 2014 | Completed final sign-off Jul 2014 | 81 Water St | Artcore Construction | revision to app#201402219091. revise structural details. n/a for the maher ordinance #155-13Details
revision to app#201402219091. revise structural details. n/a for the maher ordinance #155-13 | $15,000 |
| Feb 21, 2014 | Completed final sign-off Jul 2014 | 81 Water St | structural strengthening at ground floor per plan. structural work only.Details
structural strengthening at ground floor per plan. structural work only. | $20,000 | |
| Dec 4, 2008 | Completed final sign-off Jan 2009 | 89 Water St | The Window Specialist | work @ unit# 89 only. install 6 pella double casements, wood in front facing units. install 22 white dual pane vinyl windows in rear & light well. no change in openings. sizes meet egress windows as applicable & lt & ventilation requirement.Details
work @ unit# 89 only. install 6 pella double casements, wood in front facing units. install 22 white dual pane vinyl windows in rear & light well. no change in openings. sizes meet egress windows as applicable & lt & ventilation requirement. | $18,200 |
| Dec 6, 2001 | Completed final sign-off Feb 2002 | 83 Water St | Yiu Cheong Construction Co Inc | remodel kitchen,bathroom, painting, new vinyl floor, change 4 rear side builing. no structural changDetails
remodel kitchen,bathroom, painting, new vinyl floor, change 4 rear side builing. no structural chang | $8,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.