Block 0018, lot 005
100 North Point St
- City’s use
- Commercial Office
- Built
- 1969
- Stories
- 4
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 69,204 sq ft
- Lot
- 37,812 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2011 | Expired or cancelled cancelled Jan 2026 | 100 North Point St | occupant load verification and approval to obtain fire dept public assembly permit.Details
occupant load verification and approval to obtain fire dept public assembly permit. | ||
| Oct 25, 2011 | Never finaled issued Oct 2011, no final | 100 North Point St | Pacific Auxiliary Fire Alarm | 1st floor & roof level - add 3 control relays & 2 duct detectors, duct detectors are being installed on the 1st floor, relays are being installed on the roof.Details
1st floor & roof level - add 3 control relays & 2 duct detectors, duct detectors are being installed on the 1st floor, relays are being installed on the roof. | $3,300 |
| Oct 24, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Paganini Electric Corp(See Signatories) | revision to pa #201107220823. one fcps remote power supply/charge, 2 addressable control modules, 12 smoke detectors, 56 horn/strobes, 28 strobes, 2 addressable rejays and 3 duct detectors are being provided as part of this tenant improvment project on the 1st, 2nd and 3rd floor. see job card.Details
revision to pa #201107220823. one fcps remote power supply/charge, 2 addressable control modules, 12 smoke detectors, 56 horn/strobes, 28 strobes, 2 addressable rejays and 3 duct detectors are being provided as part of this tenant improvment project on the 1st, 2nd and 3rd floor. see job card. | |
| Oct 19, 2011 | Never finaled issued Oct 2011, no final | 100 North Point St | Toll Architectural Graphics | required evac map signage for office - 12 total.Details
required evac map signage for office - 12 total. | $3,600 |
| Jul 22, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Paganini Electric Corp(See Signatories) | partial remodel of 3 floors and reconfigure fire alarm system. (522) lights, 50 switches, 125 receptacles, 120 circuits. arch ref 201104254741, 201104254739, 201104254736Details
partial remodel of 3 floors and reconfigure fire alarm system. (522) lights, 50 switches, 125 receptacles, 120 circuits. arch ref 201104254741, 201104254739, 201104254736 | $30,000 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 100 North Point St | Pacific Coast Trane Service Co. | the project consist of replaceing two existing air conditioning units on the ground floor with one central unit. the primary ductwork will be replaced for future t.i.Details
the project consist of replaceing two existing air conditioning units on the ground floor with one central unit. the primary ductwork will be replaced for future t.i. | $346,763 |
| Jun 2, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | 3rd floor mechanical & electrical work associated with approval ap #201104254736.Details
3rd floor mechanical & electrical work associated with approval ap #201104254736. | $320,000 |
| Jun 2, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | mec and elec work on floor 2 associated with approved pa# 2011.04.25.4739Details
mec and elec work on floor 2 associated with approved pa# 2011.04.25.4739 | $320,000 |
| May 19, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | mechanical and electrical work on floor 1 associated with app#201104254741Details
mechanical and electrical work on floor 1 associated with app#201104254741 | $320,000 |
| Apr 25, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | tenent improvement on the first floor including new wall, doors & glazing. mechanical electrical, life safety & sprinklers under separate permit. 1st floor.Details
tenent improvement on the first floor including new wall, doors & glazing. mechanical electrical, life safety & sprinklers under separate permit. 1st floor. | $480,000 |
| Apr 25, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | tenant improvement on the 3rd floor including new walls, doors & glazing. mechanical electrical, life safety & sprinklers under separate permit. 3rd floor.Details
tenant improvement on the 3rd floor including new walls, doors & glazing. mechanical electrical, life safety & sprinklers under separate permit. 3rd floor. | $480,000 |
| Apr 25, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | interior tenant improvement including, ceilings high wals, new ceiling work, doors & finishes. mechanical electrical, life safety & sprinklers under separate permit. 2rd floor.Details
interior tenant improvement including, ceilings high wals, new ceiling work, doors & finishes. mechanical electrical, life safety & sprinklers under separate permit. 2rd floor. | $480,000 |
| Mar 29, 2011 | Completed final sign-off May 2011 | 100 North Point St | Shaughnessy Roofing Inc | reroofingDetails
reroofing | $228,000 |
| Mar 23, 2011 | Completed final sign-off Nov 2011 | 100 North Point St | Bcci Construction Company | pre construction demolition per ab-017.Details
pre construction demolition per ab-017. | $64,000 |
| Feb 14, 2011 | Completed final sign-off Mar 2011 | 100 North Point St | barrier removal only. re stripe accessible parking stalls. provide mirrors at elevator cab. shift plmg fixtures at accessible bathrooms and provide wheel guide at ramp and provide push button door operator at non complying extg door.Details
barrier removal only. re stripe accessible parking stalls. provide mirrors at elevator cab. shift plmg fixtures at accessible bathrooms and provide wheel guide at ramp and provide push button door operator at non complying extg door. | $25,000 | |
| Feb 1, 2011 | Never finaled issued Feb 2011, no final | 100 North Point St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Aug 18, 2009 | Never finaled issued Aug 2009, no final | 100 North Point St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jun 15, 2007 | Completed final sign-off Jul 2007 | 100 North Point St | Pacific Coast Sales & Service Inc | 2 pump motores replacements on extg cooling towerDetails
2 pump motores replacements on extg cooling tower | $40,000 |
| Nov 27, 2002 | Never finaled issued Nov 2002, no final | 100 North Point St | Illuminated Creations Dba Ellis & Ellis | to erect a songle-faced non-electric wall signDetails
to erect a songle-faced non-electric wall sign | |
| Sep 11, 2002 | Completed final sign-off Apr 2003 | 100 North Point St | Swinerton Builders | installation of new fire alarm system-per nfpa 72Details
installation of new fire alarm system-per nfpa 72 | $30,000 |
| Sep 4, 2002 | Completed final sign-off May 2003 | 100 North Point St | oti-2 (3rd floor) el, meDetails
oti-2 (3rd floor) el, me | $40,000 | |
| Sep 4, 2002 | Expired or cancelled expired Apr 2007 | 100 North Point St | oti-2 1st floor el meDetails
oti-2 1st floor el me | $20,000 | |
| Aug 21, 2002 | Completed final sign-off Apr 2003 | 100 North Point St | oti-2 2/f el meDetails
oti-2 2/f el me | $40,000 | |
| Aug 13, 2002 | Completed final sign-off Apr 2003 | 100 North Point St | Intelligent Technologies & Services Inc | install fire shp panel fire suppression system. for 1st flr server room 117Details
install fire shp panel fire suppression system. for 1st flr server room 117 | $5,600 |
| Aug 5, 2002 | Completed final sign-off Apr 2003 | 100 North Point St | oti-1, 1st floor, el, me, ls.Details
oti-1, 1st floor, el, me, ls. | $81,000 | |
| Jul 30, 2002 | Expired or cancelled expired Apr 2007 | 100 North Point St | oti-1 2/f el me lsDetails
oti-1 2/f el me ls | $234,180 | |
| Jul 30, 2002 | Completed final sign-off Apr 2003 | 100 North Point St | oti-1 3/f el me lsDetails
oti-1 3/f el me ls | $241,524 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (7), Paganini Electric Corp(See Signatories) (2), Illuminated Creations Dba Ellis & Ellis, Intelligent Technologies & Services Inc, Pacific Auxiliary Fire Alarm, Pacific Coast Sales & Service Inc, Pacific Coast Trane Service Co., Shaughnessy Roofing Inc, Swinerton Builders, Toll Architectural Graphics