Yves Ghiai-Chamlou
- Listed as
- architect, engineer
- Firm
- Ghiai Development Corp
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to May 2023
11 permits since 2000 (architect on 10 permits, engineer on 1 permit): 7 completed, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Completed final sign-off Aug 2023 | 2347 12th Av | L Briseno Construction | convert laundry room to bathroom and closet. add sub panel.Details
convert laundry room to bathroom and closet. add sub panel. | $25,000 |
| Dec 12, 2018 | Completed final sign-off Dec 2018 | 2255 Pine St | Mountain Bay Construction | revision to pa 2017-0612-9043 minor floor plan modifications reconfigure basement layout stair layout, 1st & 2nd floorDetails
revision to pa 2017-0612-9043 minor floor plan modifications reconfigure basement layout stair layout, 1st & 2nd floor | |
| May 21, 2018 | Completed final sign-off Dec 2018 | 2255 Pine St | Mountain Bay Construction | revision to permit ap# 201706129043; remove brick, replace with new reinforces, concrete foundation as shownDetails
revision to permit ap# 201706129043; remove brick, replace with new reinforces, concrete foundation as shown | $10,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 200 Cherry St | Mountain Bay Construction | revision to permit #2018-0214-1278. change stairs construction from concrete to wood construction.Details
revision to permit #2018-0214-1278. change stairs construction from concrete to wood construction. | |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 200 Cherry St | Mountain Bay Construction | to comply with complaint 201726901 - demo & replace (e) exterior stairs & landing, like for likeDetails
to comply with complaint 201726901 - demo & replace (e) exterior stairs & landing, like for like | $1,800 |
| Jun 12, 2017 | Completed final sign-off Dec 2018 | 2255 Pine St | Mountain Bay Construction | remodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevationsDetails
remodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevations | $130,000 |
| Oct 5, 2016 | Never finaled filed Oct 2016, never issued | 2101 Lombard St | demolish of 1 story commercial retail buildingDetails
demolish of 1 story commercial retail building | $100,000 | |
| Oct 5, 2016 | Never finaled filed Oct 2016, never issued | 2101 Lombard St | project proposes demolition of an existing (1) story formula retail restaurant. proposal will use the individually requested state density bonus program for the construction of a new mixed use building of (6) stories over basement. the building is to consist of (15) dwelling units on levels 2-5, levDetails
project proposes demolition of an existing (1) story formula retail restaurant. proposal will use the individually requested state density bonus program for the construction of a new mixed use building of (6) stories over basement. the building is to consist of (15) dwelling units on levels 2-5, lev | $2,500,000 | |
| Sep 10, 2015 | Completed final sign-off Aug 2017 | 2334 Webster St | Mountain Bay Construction | revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath.Details
revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath. | $40,000 |
| Mar 26, 2015 | Completed final sign-off Aug 2017 | 2334 Webster St | Mountain Bay Construction | remodel 2 kitchens & 4 baths of both units - replace cabinets & fixtures. no kitchen remodel on unit #2336. kitchen 12 x 16, bathroom 6 x 8 each, total of 1 kitchen & 4 bathrooms.Details
remodel 2 kitchens & 4 baths of both units - replace cabinets & fixtures. no kitchen remodel on unit #2336. kitchen 12 x 16, bathroom 6 x 8 each, total of 1 kitchen & 4 bathrooms. | $30,000 |
| Sep 16, 2013 | Never finaled issued Sep 2013, no final | 1122 Vallejo St | Mountain Bay Construction, Fay Construction & Restoration Inc | repair dryrot on existing porch, include new walls, ceiling & floors, new insulation, replace existing windows & doors, not visable from the street. (e) porch approved for variance, case #2003-0476y.Details
repair dryrot on existing porch, include new walls, ceiling & floors, new insulation, replace existing windows & doors, not visable from the street. (e) porch approved for variance, case #2003-0476y. | $18,000 |