Yim Fu Him
- Listed as
- architect, authorized agent-others, engineer
- On San Francisco permits
- Oct 2004 to Oct 2007
14 permits since 2000 (engineer on 9 permits, architect on 5 permits, authorized agent-others on 2 permits): 10 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2007 | Never finaled issued Feb 2008, no final | 651 Howard St | establishing occupant load for admistrative purposes on three levels. (bsmt, first floor and 2nd floor) ref. drawings appl# 200211151568, 200306207274, 200308121806, 200309306135, 200310207928, 200403118385.Details
establishing occupant load for admistrative purposes on three levels. (bsmt, first floor and 2nd floor) ref. drawings appl# 200211151568, 200306207274, 200308121806, 200309306135, 200310207928, 200403118385. | ||
| Nov 1, 2006 | Expired or cancelled expired Nov 2012 | 107 Lobos St | erect 3 stories, 1 dwelling unit building.Details
erect 3 stories, 1 dwelling unit building. | $400,000 | |
| Jun 8, 2006 | Completed final sign-off Jan 2007 | 369 Chicago Wy | revision to appl# 200507258470 s1/r1, changehold down hd2a to hd5a on new 1st floor line, sheer wall and foundation per "s1" sheet. change new roof diagram nail per sheet "s1" notes "5".Details
revision to appl# 200507258470 s1/r1, changehold down hd2a to hd5a on new 1st floor line, sheer wall and foundation per "s1" sheet. change new roof diagram nail per sheet "s1" notes "5". | ||
| Oct 19, 2005 | Completed final sign-off Jul 2007 | 740 Natoma St | 1 story addition(new 3/f) above(e)2/f for(n)upper unit.convert (e)garment shop to residential area & garage use on (e)g/f.g/f residential area for 2/f(lower unit)use only.alteration to (e)2/f. change (e)facade siding to new stucco.Details
1 story addition(new 3/f) above(e)2/f for(n)upper unit.convert (e)garment shop to residential area & garage use on (e)g/f.g/f residential area for 2/f(lower unit)use only.alteration to (e)2/f. change (e)facade siding to new stucco. | $100,000 | |
| Aug 30, 2005 | Completed final sign-off Dec 2005 | 2166 30th Av | revision to app # 200508170456 foundation work per plan/also to construct a 6'high retaining wall inDetails
revision to app # 200508170456 foundation work per plan/also to construct a 6'high retaining wall in | $10,000 | |
| Jul 6, 2005 | Completed final sign-off Oct 2006 | 2479 27th Av | Shing Hing Construction Co | propose horizontal one story addition at rear of exist. twostory over garage, single family dwellingDetails
propose horizontal one story addition at rear of exist. twostory over garage, single family dwelling | $38,000 |
| May 25, 2005 | Completed final sign-off Apr 2007 | 2522 39th Av | Rong Guo Zhu | proposed horizontal one story addition at rear of existing one story over gargae, singles familyDetails
proposed horizontal one story addition at rear of existing one story over gargae, singles family | $38,000 |
| Apr 12, 2005 | Completed final sign-off Aug 2005 | 72 Merced Av | Oriental Construction & Metal Corp. | add 1 bedroom,1 playroom,1 full bath,1 storage on (e)g/f.add 2 full bath on (e)3/f.alter (e)2/f 3/fDetails
add 1 bedroom,1 playroom,1 full bath,1 storage on (e)g/f.add 2 full bath on (e)3/f.alter (e)2/f 3/f | $26,000 |
| Feb 1, 2005 | Completed final sign-off Nov 2005 | 2362 34th Av | proposed horizontal two story addition at rear of (e) one sotry over garage. single family dwellingDetails
proposed horizontal two story addition at rear of (e) one sotry over garage. single family dwelling | $100,000 | |
| Feb 1, 2005 | Completed final sign-off Feb 2006 | 365 San Leandro Wy | construct two one story rear deck (max.6'-0" height). remove (3) wood posts and wood beam above &Details
construct two one story rear deck (max.6'-0" height). remove (3) wood posts and wood beam above & | $32,000 | |
| Jan 20, 2005 | Completed final sign-off Jan 2006 | 283 Flournoy St | proposed horizontal two story addition at rear of (e) one story over garage, single family dwellingDetails
proposed horizontal two story addition at rear of (e) one story over garage, single family dwelling | $70,000 | |
| Jan 20, 2005 | Completed final sign-off Mar 2005 | 546 36th Av | provide new bearing wall with new footing to support raise floor per ground floor plan(revision to#Details
provide new bearing wall with new footing to support raise floor per ground floor plan(revision to# | $3,000 | |
| Oct 27, 2004 | Expired or cancelled withdrawn Oct 2004 | 111 Lobos St | revision to pa# 2002/07/15/1442 per plans.Details
revision to pa# 2002/07/15/1442 per plans. | $500 | |
| Oct 27, 2004 | Expired or cancelled withdrawn Oct 2004 | 109 Lobos St | revision to pa# 2002/07/15/1437 per plans.Details
revision to pa# 2002/07/15/1437 per plans. | $500 |