Pike Xinxin Nong
- Listed as
- architect
- Firm
- Rabit Architecture Inc
- Based in
- Concord
- On San Francisco permits
- Oct 2019 to Jun 2025
4 permits since 2000 (architect on 4 permits): 1 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2025 | In progress issued Sep 2026 | 1359 12th Av | altered site permit for pa# 201909050842. new 2nd unit replacing (e) udu on ground floor in back. attached addition to (e) main unit on 1st & 2nd floor on top of new 2nd dwelling unit. balcony & staircase for the main unit to the backyardDetails
altered site permit for pa# 201909050842. new 2nd unit replacing (e) udu on ground floor in back. attached addition to (e) main unit on 1st & 2nd floor on top of new 2nd dwelling unit. balcony & staircase for the main unit to the backyard | $250,000 | |
| Aug 16, 2021 | Never finaled issued Mar 2023, no final | 1073 Church St | Prosper Construction Dev Inc. | 1. interior remodel of lower floor to be attached adu: - new kitchen, living area, two bedrooms and two bathrooms; - relocation of water heater and furnace to the basement; 2. remodel of the rear staircase connecting the main unit and adu; 3. replace/retrofit the existing masonry foundationDetails
1. interior remodel of lower floor to be attached adu: - new kitchen, living area, two bedrooms and two bathrooms; - relocation of water heater and furnace to the basement; 2. remodel of the rear staircase connecting the main unit and adu; 3. replace/retrofit the existing masonry foundation | $112,000 |
| Aug 5, 2021 | Never finaled issued Jul 2022, no final | 1073 Church St | Prosper Construction Dev Inc. | demolish (e) deck between the main dwelling & garage, bridge the main dwelling & garage wi/ (n) deck. (n) decking over the garage. (n) 2-story deck & balcony replacing the (e).Details
demolish (e) deck between the main dwelling & garage, bridge the main dwelling & garage wi/ (n) deck. (n) decking over the garage. (n) 2-story deck & balcony replacing the (e). | $15,000 |
| Oct 7, 2019 | Completed final sign-off Apr 2023 | 2820 Folsom St | Castillo Builders Inc | interior renovations of 3 units, removal of interior walls to create open space for common areas electrical updates with new recessed lights, new outlets and hvac sytem, add 2 bathrooms each for unit a & b 1 more for unit cDetails
interior renovations of 3 units, removal of interior walls to create open space for common areas electrical updates with new recessed lights, new outlets and hvac sytem, add 2 bathrooms each for unit a & b 1 more for unit c | $300,000 |