Xi Meng
- Listed as
- architect, authorized agent-others, designer
- Firm
- Sharchitecture
- Based in
- Pacifica
- On San Francisco permits
- Jun 2012 to Mar 2016
10 permits since 2000 (architect on 7 permits, designer on 2 permits, authorized agent-others on 1 permit): 8 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2016 | Completed final sign-off Aug 2016 | 2592 38th Av | Ehj Construction,Inc. | interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room.Details
interior remodel of top floor unit, work include: bathroom & kitchen remodel, remove one non-structural partition wall between the dining room and the kitchen. replace ceiling mounted light fixtures in the existing two bedrooms and dining room. | $40,000 |
| Mar 3, 2016 | Completed final sign-off Apr 2016 | 2225 23rd St | Ehj Construction,Inc. | bldg b: install one mail box at building b 1st floor interior corridors adjacent to the staircase. there are total of 6 mail boxes for a total of 6 corridor locations. the building b is the building along rhode island street.Details
bldg b: install one mail box at building b 1st floor interior corridors adjacent to the staircase. there are total of 6 mail boxes for a total of 6 corridor locations. the building b is the building along rhode island street. | $15,000 |
| Feb 18, 2016 | Never finaled issued Jul 2016, no final | 3669 23rd St | Ehj Construction,Inc. | add a 3rd unit by remodel part of ground level garage & utility space into 3rd dwelling unit, 1 bedroom & 1 bathroom. see notice of special restrictions 2016-k239841-00.Details
add a 3rd unit by remodel part of ground level garage & utility space into 3rd dwelling unit, 1 bedroom & 1 bathroom. see notice of special restrictions 2016-k239841-00. | $35,000 |
| Jul 30, 2015 | Completed final sign-off Aug 2015 | 622 Filbert St | Ehj Construction,Inc. | replace 4 deck posts that are damaged by dryrot at extg exterior deck. one at each floor at the corner of the deck. replace dryrot damaged floor joists and blocking connected to the posts as required. less than 50%. replacement in-kindDetails
replace 4 deck posts that are damaged by dryrot at extg exterior deck. one at each floor at the corner of the deck. replace dryrot damaged floor joists and blocking connected to the posts as required. less than 50%. replacement in-kind | $9,000 |
| Jun 23, 2015 | Completed final sign-off Jul 2015 | 3701 Geary Bl | add one non-structural partition wall between the extg kitchen and the extg dinning room.Details
add one non-structural partition wall between the extg kitchen and the extg dinning room. | $5,000 | |
| May 14, 2015 | Expired or cancelled withdrawn Jan 2018 | 422 Geary St | 1)add a sushi bar in the extg dinning space. the sushi bar will have 2 new prep sinks and other kitchen equipment. 2)cut an opening in an extg partition wall. the wall is non-structural. replace water heater.Details
1)add a sushi bar in the extg dinning space. the sushi bar will have 2 new prep sinks and other kitchen equipment. 2)cut an opening in an extg partition wall. the wall is non-structural. replace water heater. | $15,000 | |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 3669 23rd St | Ehj Construction,Inc. | replace the entire dryrot damaged south exterior wall stud of the bldg. replace one exisitng window header with new, replace some wall stud around the window above. (repair in kind). add one beam to support (e) ceiling joist.Details
replace the entire dryrot damaged south exterior wall stud of the bldg. replace one exisitng window header with new, replace some wall stud around the window above. (repair in kind). add one beam to support (e) ceiling joist. | $17,000 |
| Nov 20, 2014 | Completed final sign-off Apr 2015 | 3669 23rd St | Ehj Construction,Inc. | interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replaceDetails
interior remodel of unit #3669, kitchen remodel, bathroom remodel, remove 1 interior non-load bearing wall. remove (1) non-street facing exterior window & infill with wall. interior lighting remodel, interior finishes remodel, repl all non-street facing windows w/double pane vinyl windows. replace | $50,000 |
| Nov 13, 2014 | Completed final sign-off Aug 2018 | 704 Post St | remodel of (e) paris cafe into a restaurant. install new hood & food service equipment. this is an interior remodel only. install exhaust fan & map-up air unit on roof. no changes to store front & street facade.Details
remodel of (e) paris cafe into a restaurant. install new hood & food service equipment. this is an interior remodel only. install exhaust fan & map-up air unit on roof. no changes to store front & street facade. | $50,000 | |
| Jun 1, 2012 | Completed final sign-off Feb 2013 | 333 Harrison St | Webcor Construction Lp | landscape improvements including trees, lighting, playground equipment, steps, railings and fencing.Details
landscape improvements including trees, lighting, playground equipment, steps, railings and fencing. | $400,000 |