Wilson Yau
- License
- 33726
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Wilson Yau Engineering
- Based in
- Fresno
- On San Francisco permits
- Feb 2016 to Aug 2018
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Wing Cheung Construction Co (3), Lao's Construction
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 3910 Mission St | Wing Cheung Construction Co | commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom.Details
commercial space only. comply w/ mandatory soft story program per sfebc chapter 4-d. ada upgrade for bathroom. | $60,000 |
| Aug 22, 2018 | Completed final sign-off Aug 2019 | 3906 Mission St | Wing Cheung Construction Co | residential only. comply w/ mandatory soft story program per sfebc chapter 4-d. 2016 cebc a-4.Details
residential only. comply w/ mandatory soft story program per sfebc chapter 4-d. 2016 cebc a-4. | $20,000 |
| Dec 29, 2016 | Completed final sign-off Dec 2019 | 123 Valmar Tr | Lao's Construction | horizontal addtion of two story rear addition w/two (n) bedroom & (n) full bath on 1st flr, (n) living/dinning room on 2nd flr and (n) deck.Details
horizontal addtion of two story rear addition w/two (n) bedroom & (n) full bath on 1st flr, (n) living/dinning room on 2nd flr and (n) deck. | $80,000 |
| Feb 3, 2016 | Completed final sign-off May 2016 | 2615 24th St | Wing Cheung Construction Co | revision of shear walls location. ref. to pa#201506239666. n/a ordinance #155-13Details
revision of shear walls location. ref. to pa#201506239666. n/a ordinance #155-13 |