William W Yu
- License
- C82028
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C82028 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2017 to Apr 2024
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kaifa Construction Inc, Odysseus Builders
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 2, 2024 | Completed final sign-off Jan 2026 | 226 24th Av | Kaifa Construction Inc | work located on the upper floor- bathroom and kitchen renovation, one window replacement (not street facing), removal of short partition walls.Details
work located on the upper floor- bathroom and kitchen renovation, one window replacement (not street facing), removal of short partition walls. | $50,000 |
| Dec 21, 2017 | Completed final sign-off May 2018 | 1968 Quint St | revision to permit 201708286154 lattice to be added to guardrail on west side of deck-revision accepted by board of appealsDetails
revision to permit 201708286154 lattice to be added to guardrail on west side of deck-revision accepted by board of appeals | $50 | |
| Sep 20, 2017 | Completed final sign-off Nov 2017 | 226 Leland Av | Odysseus Builders | remove an (e) non-bearing wall between kitchen & dining room at 2nd & 3rd floor. install new cabinets & countertop.Details
remove an (e) non-bearing wall between kitchen & dining room at 2nd & 3rd floor. install new cabinets & countertop. | $10,000 |