William Schuppel
- License
- C2889
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Dec 2006 to Nov 2007
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Engineers
- Heston Chau
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2007 | Completed final sign-off Jun 2008 | 1075 Columbus Av | erect scaffold & remove 1/4" mahogany plywood on exterior of bldg & install hardi-board sideing over existing 5/8" redwood plywood.Details
erect scaffold & remove 1/4" mahogany plywood on exterior of bldg & install hardi-board sideing over existing 5/8" redwood plywood. | $23,000 | |
| Apr 30, 2007 | Never finaled issued Apr 2007, no final | 3360 Geary Bl | changes to approved alteration app #200603237414-r2. 1) 90 minute elevator smoke door in garage vestibule eliminated. 2) this is a one hour type 5 building,all reference to 3 hour occupancy separation between garage and office above eliminatedDetails
changes to approved alteration app #200603237414-r2. 1) 90 minute elevator smoke door in garage vestibule eliminated. 2) this is a one hour type 5 building,all reference to 3 hour occupancy separation between garage and office above eliminated | ||
| Dec 29, 2006 | Completed final sign-off Apr 2007 | 390 Laurel St | remodel (e) restrooms for disabled access compliance. barrior removal. no structural work.Details
remodel (e) restrooms for disabled access compliance. barrior removal. no structural work. | $16,000 |