William F. Holland
- Listed as
- architect, engineer
- Firm
- Wm F. Holland/Architect
- Based in
- Oakland
- On San Francisco permits
- Sep 2005 to Jul 2014
5 permits since 2000 (architect on 4 permits, engineer on 1 permit): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2014 | Completed final sign-off Feb 2015 | 2273 California St | O'neill Construction Inc | install 3 dormers on top floor at rear of building plus bathroom & skylights. n/a ordinance #155-13.Details
install 3 dormers on top floor at rear of building plus bathroom & skylights. n/a ordinance #155-13. | $18,770 |
| Oct 5, 2011 | Completed final sign-off Jul 2012 | 501 El Camino Del Mar | K. Brunner & Associates | remodel e 1-kitchen and 1-bathroom. remove non bearing partition. replace aluminum windows with new wood as noted, size changes. lighting to comply w/ cec 150(k)Details
remodel e 1-kitchen and 1-bathroom. remove non bearing partition. replace aluminum windows with new wood as noted, size changes. lighting to comply w/ cec 150(k) | $85,000 |
| Jun 11, 2008 | Expired or cancelled cancelled Jan 2020 | 44 25th Av | Rapp Construction Co. | 6' rear fence over new concrete foundation and retaining wall. (existing spa approved under pa# 2007.09.21.3437.)Details
6' rear fence over new concrete foundation and retaining wall. (existing spa approved under pa# 2007.09.21.3437.) | $35,000 |
| Jan 31, 2008 | Completed final sign-off Jan 2012 | 1864 Green St | Scott & Warner Builders Inc, Deluxe Shotcrete & Concrete Construction | raise ex. bldg approximately 1'-8" to create new parking in basement area. horizontal addition at the rear yard. add elevator and new 2nd means of egress.Details
raise ex. bldg approximately 1'-8" to create new parking in basement area. horizontal addition at the rear yard. add elevator and new 2nd means of egress. | $1,500,000 |
| Sep 30, 2005 | Completed final sign-off Jun 2006 | 482 Liberty St | H L S. Inc Dba Wolf General | interior remodel including kitchen, entry, and closet, with no structural changes. expanding 1str fl storage area. repair dry rot and replace garage floor at street level. voluntery foundation stablazation & partial sheer walling at lower basemet. replacing dry rotted front door.Details
interior remodel including kitchen, entry, and closet, with no structural changes. expanding 1str fl storage area. repair dry rot and replace garage floor at street level. voluntery foundation stablazation & partial sheer walling at lower basemet. replacing dry rotted front door. | $164,000 |