William D Andersen
- License
- C28231
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- William Andersen
- On San Francisco permits
- Mar 2003 to Mar 2014
6 permits since 2000 (architect on 5 permits, authorized agent-others on 1 permit): 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Speedy Construction ****See Note (3), Maven Maintenance Inc
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 4, 2014 | Completed final sign-off Feb 2016 | 901 Divisadero St | change of use only from retail sales to limited restaurant. no work under this permit.Details
change of use only from retail sales to limited restaurant. no work under this permit. | ||
| Jan 31, 2014 | Completed final sign-off Oct 2014 | 854 Geary St | Maven Maintenance Inc | revision to pa# 2013/11/13/1842 to change of use from coffee shop to a wine bar. no construction under this application. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2013/11/13/1842 to change of use from coffee shop to a wine bar. no construction under this application. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 1492 Pacific Av | Speedy Construction ****See Note | #9 - remove non load bearing at kitchen/hallway, install new refrigerator, sink & counter in kitchen, modify closet in bedroom #1.Details
#9 - remove non load bearing at kitchen/hallway, install new refrigerator, sink & counter in kitchen, modify closet in bedroom #1. | $10,000 |
| Jan 15, 2014 | Completed final sign-off May 2014 | 727 35th Av | Speedy Construction ****See Note | install new full bathroom at 3rd floor, remodel kitchn & 1/2 bthroom at 2nd floor.Details
install new full bathroom at 3rd floor, remodel kitchn & 1/2 bthroom at 2nd floor. | $15,000 |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 1492 Pacific Av | Speedy Construction ****See Note | #12- remove non load bearing wall at living/bedroom, install new kitchen & counter, sink & refrigerator.Details
#12- remove non load bearing wall at living/bedroom, install new kitchen & counter, sink & refrigerator. | $10,000 |
| Mar 5, 2003 | Expired or cancelled expired Aug 2005 | 117 New Montgomery St | built enclosure at basement level-legalize construction per n.o.v. 200233951Details
built enclosure at basement level-legalize construction per n.o.v. 200233951 | $4,000 |