William Cullen
- Listed as
- architect, engineer, pmt consultant/expediter
- Firm
- William E. Cullen Aia
- On San Francisco permits
- Jan 2005 to Mar 2023
20 permits since 2000 (architect on 18 permits, engineer on 2 permits, pmt consultant/expediter on 1 permit): 12 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2023 | In progress issued Mar 2024 | 342 Duncan St | Prague Property Management Inc | rev to pa# 2019-1107-6705: new structural beamDetails
rev to pa# 2019-1107-6705: new structural beam | $3,000 |
| Jun 25, 2021 | Never finaled issued Sep 2021, no final | 44 Malta Dr | remove and replace decking. repair framing. replace railings. repair dryrotDetails
remove and replace decking. repair framing. replace railings. repair dryrot | $10,000 | |
| Sep 19, 2020 | Completed final sign-off Mar 2021 | 415 Kirkham St | Red Bridge Construction Inc | install new skylight. miscellaneous non-structural finish improvements.Details
install new skylight. miscellaneous non-structural finish improvements. | $2,500 |
| Nov 7, 2019 | Never finaled issued Dec 2020, no final | 342 Duncan St | A J O Group Build Inc, California Building And Remodeling, Prague Property Management Inc | replace slab & brick foundation, restore as level floor new interior stairs, misc related inerior finishesDetails
replace slab & brick foundation, restore as level floor new interior stairs, misc related inerior finishes | $36,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 315 Elizabeth St | Structural Concepts Design Build Corp | replace (e) exit stairs in kindDetails
replace (e) exit stairs in kind | $2,000 |
| Jul 23, 2019 | Completed final sign-off Sep 2019 | 415 Kirkham St | Structural Concepts Design Build Corp | less than 50% entry stairs repairDetails
less than 50% entry stairs repair | $7,000 |
| Jun 27, 2019 | Expired or cancelled cancelled Jan 2026 | 651 27th St | sun room addition and roof deck with related stairs and remodel extg bathroom.Details
sun room addition and roof deck with related stairs and remodel extg bathroom. | $180,000 | |
| Jan 28, 2019 | Completed final sign-off Jul 2019 | 451 Fair Oaks St | Structural Concepts Design Build Corp | bedroom improvements. remove failing lahe & plaster, installl lights, sheet rock and trim, remove closets, replace 1 window in kind. milgard with 2 inch reveal, double-hung. demo and refinish deteriorated.Details
bedroom improvements. remove failing lahe & plaster, installl lights, sheet rock and trim, remove closets, replace 1 window in kind. milgard with 2 inch reveal, double-hung. demo and refinish deteriorated. | $18,000 |
| Jul 25, 2018 | Completed final sign-off May 2019 | 451 Fair Oaks St | Structural Concepts Design Build Corp | structural upgrade, replace exterior stairsDetails
structural upgrade, replace exterior stairs | $15,000 |
| Dec 15, 2017 | Never finaled issued Jan 2018, no final | 451 Fair Oaks St | Structural Concepts Design Build Corp | window replacement & new window. ref #201710242097Details
window replacement & new window. ref #201710242097 | $1,000 |
| Oct 24, 2017 | Completed final sign-off Sep 2018 | 451 Fair Oaks St | Structural Concepts Design Build Corp | 3/f- remodel (e) bathroom, add shower. 2/f- new full bathroom & add window.Details
3/f- remodel (e) bathroom, add shower. 2/f- new full bathroom & add window. | $32,000 |
| Aug 4, 2017 | Expired or cancelled cancelled Jan 2026 | 415 Kirkham St | repair & replace concrete sill/footing under front stairway.Details
repair & replace concrete sill/footing under front stairway. | $4,000 | |
| Feb 24, 2017 | Completed final sign-off Nov 2017 | 451 Fair Oaks St | Structural Concepts Design Build Corp | demo & replace (e) kitchen. replace (e) windows, new elec floor pad & new floor finish at back of house.Details
demo & replace (e) kitchen. replace (e) windows, new elec floor pad & new floor finish at back of house. | $20,000 |
| Feb 16, 2017 | Completed final sign-off Oct 2019 | 329 San Jose Av | Gregory Loughran Construction | demolitioni of (e) front entry steps and replace with new in-kind.Details
demolitioni of (e) front entry steps and replace with new in-kind. | $20,000 |
| Sep 6, 2016 | Completed final sign-off Oct 2017 | 304 Gold Mine Dr | Structural Concepts Design Build Corp | revision to 201605107008, revised beam selection and detail. no change to scope of work in progressDetails
revision to 201605107008, revised beam selection and detail. no change to scope of work in progress | |
| Aug 23, 2016 | Never finaled issued Jul 2017, no final | 1015 Castro St | replace exisitng exit stairs & related deck at rear. extend existing grade level deck.Details
replace exisitng exit stairs & related deck at rear. extend existing grade level deck. | $7,000 | |
| Jul 13, 2016 | Completed final sign-off Dec 2017 | 304 Gold Mine Dr | Structural Concepts Design Build Corp | add new deck at rear of house 10x12'Details
add new deck at rear of house 10x12' | $20,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 2988 Washington St | Cullen Construction & Reconstruction | replace extg deck (less than 10' in height above grade). in-kind.Details
replace extg deck (less than 10' in height above grade). in-kind. | $5,000 |
| Aug 29, 2013 | Completed final sign-off Oct 2013 | 42 Malta Dr | Structural Concepts Design Build Corp | existing deck to be repaired. additional support added.Details
existing deck to be repaired. additional support added. | $14,000 |
| Jan 18, 2005 | Completed final sign-off Jul 2005 | 388 Cresta Vista Dr | upgrade (e)unwarranted room to code,add bedroom & bathroom on lower garage level,add entrywayDetails
upgrade (e)unwarranted room to code,add bedroom & bathroom on lower garage level,add entryway | $32,000 |