Wesley Azzouz
- Listed as
- architect
- Firm
- Classical Design Group
- Based in
- San Luis Opispo
- On San Francisco permits
- May 2022 to Oct 2022
3 permits since 2000 (architect on 3 permits): 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2022 | Expired or cancelled cancelled Jan 2026 | 1700 Post St | partial soft demo on basement floor plan. remove partial height wall and three sinks, two toilets and one bathroom sink. ab-017. plumbing fixtures will be recalculated in the next tenant improvement.Details
partial soft demo on basement floor plan. remove partial height wall and three sinks, two toilets and one bathroom sink. ab-017. plumbing fixtures will be recalculated in the next tenant improvement. | $5,000 | |
| Oct 19, 2022 | Never finaled filed Oct 2022, never issued | 1700 Post St | add equipment for molding, chocolate products. install new electrical circuit in (e) electrical panel. add, register to hvac ductwork, add walk in cooler. add drop ceiling, add plumbing fitures to (e) drains and supply replace (e) water heaters.Details
add equipment for molding, chocolate products. install new electrical circuit in (e) electrical panel. add, register to hvac ductwork, add walk in cooler. add drop ceiling, add plumbing fitures to (e) drains and supply replace (e) water heaters. | $125,000 | |
| May 13, 2022 | Expired or cancelled cancelled Jan 2026 | 1700 Post St | unit b: tenant improvement. add electrical circuits to (e) electrical panel, creating 3 partition walls, adjustment to (e) hvac duct work. add walk in refrigerator and freezer, add hot and cold water supply piping (sanitary flr drains are already in place).Details
unit b: tenant improvement. add electrical circuits to (e) electrical panel, creating 3 partition walls, adjustment to (e) hvac duct work. add walk in refrigerator and freezer, add hot and cold water supply piping (sanitary flr drains are already in place). | $40,000 |