John Walker
- Listed as
- architect
- Firm
- Walker & Moody Architects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Sep 2025
43 permits since 2000 (architect on 43 permits): 21 completed, 6 in progress, 6 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | In progress issued Jun 2026 | 3515 Pacific Av | Plath & Company Inc | level b2 only: revision to 201907267098 s2. change const type from approved type vb to type 1a at sub-basement b2 only: change from nfpa-13r to nfpa 13 at sub-basmnt level b2 only. modify (e) pandeck flr/ceiling assemply at lvl b2 to provide 3 hr rated floor/ceiling assemblyDetails
level b2 only: revision to 201907267098 s2. change const type from approved type vb to type 1a at sub-basement b2 only: change from nfpa-13r to nfpa 13 at sub-basmnt level b2 only. modify (e) pandeck flr/ceiling assemply at lvl b2 to provide 3 hr rated floor/ceiling assembly | |
| Apr 15, 2024 | In progress issued Aug 2024 | 3515 Pacific Av | Plath & Company Inc | alter site pa 201907267098 minnor exterior modifications. adjust window layout at 2 story bay: widen to 15' change rouned corners. bay @ front changed from angled to rounded. 3rd stor @ east end front wall pulled in from roof edge above, exterior recess created.rear facaded angled corners changed toDetails
alter site pa 201907267098 minnor exterior modifications. adjust window layout at 2 story bay: widen to 15' change rouned corners. bay @ front changed from angled to rounded. 3rd stor @ east end front wall pulled in from roof edge above, exterior recess created.rear facaded angled corners changed to | $10,000 |
| Mar 4, 2024 | Completed final sign-off Feb 2025 | 999 Green St | Bjlgc Inc | create an enclosure for the buildings wall-mounted fire alarm equipmentDetails
create an enclosure for the buildings wall-mounted fire alarm equipment | $20,000 |
| Dec 14, 2023 | In progress issued Sep 2024 | 3515 Pacific Av | Plath & Company Inc | structural revisions to pa 2019-0726-7098-s1. based on altered site pa# 202403147869. revisions per delta clouds 6, 7, & 8.Details
structural revisions to pa 2019-0726-7098-s1. based on altered site pa# 202403147869. revisions per delta clouds 6, 7, & 8. | $4,000 |
| Sep 7, 2023 | In progress issued Dec 2023 | 3515 Pacific Av | Plath & Company Inc | addendum revision to 201907267098-s1. se & sw corners of rear yard, se corner: relocation one of solid pier/reconfig of retaining wall, reconfig of low landscaping wall. sw corner: reconfig of top landscaping & steps dow to landingDetails
addendum revision to 201907267098-s1. se & sw corners of rear yard, se corner: relocation one of solid pier/reconfig of retaining wall, reconfig of low landscaping wall. sw corner: reconfig of top landscaping & steps dow to landing | $8,000 |
| Aug 5, 2022 | In progress issued Aug 2025 | 3555 Pacific Av | M S E Environmental Inc | demo a two story home with basement, type v-bDetails
demo a two story home with basement, type v-b | $10,000 |
| Aug 5, 2022 | In progress issued Aug 2025 | 3555 Pacific Av | Plath & Company Inc, M S E Environmental Inc | to erect 3 stories 2 basement single family dwellingDetails
to erect 3 stories 2 basement single family dwelling | $2,200,000 |
| Feb 23, 2022 | Completed final sign-off Apr 2022 | 2650 Hyde St | Cal Am Construction Inc. | revision to 201912139514 and 201507080940 for final inspection approval per field inspector. delete planter boxes at roof 2. delete perimeter glass rail at roof perimeter 3. modify glassrail at roof deck perimeterDetails
revision to 201912139514 and 201507080940 for final inspection approval per field inspector. delete planter boxes at roof 2. delete perimeter glass rail at roof perimeter 3. modify glassrail at roof deck perimeter | $500 |
| Oct 18, 2021 | Completed final sign-off Aug 2023 | 2666 Hyde St | Cal Am Construction Inc. | modification to (e) parapet at existing deck at rear yard. also, repair/replace in kind as needed sections of same parapet adjacent and continuous to portion of modificed parapet for adequate support of parapet. this permit follows pa# 201806081445. both permit are to comply w/and resolve nov#Details
modification to (e) parapet at existing deck at rear yard. also, repair/replace in kind as needed sections of same parapet adjacent and continuous to portion of modificed parapet for adequate support of parapet. this permit follows pa# 201806081445. both permit are to comply w/and resolve nov# | $8,000 |
| Dec 13, 2019 | Completed final sign-off Apr 2022 | 2650 Hyde St | revision to pa# 2015-0708-0940: show new location of new furnace. at south property line, replace glass rail with solid parapet. upper roof deck replace int. glass rail w/ metal railing. at lower deck, delete glass rail, existing open metal rail to remainDetails
revision to pa# 2015-0708-0940: show new location of new furnace. at south property line, replace glass rail with solid parapet. upper roof deck replace int. glass rail w/ metal railing. at lower deck, delete glass rail, existing open metal rail to remain | $800 | |
| Jul 26, 2019 | Never finaled issued Sep 2022, no final | 3515 Pacific Av | Plath & Company Inc | demolish a 3-story, type 5, single family bldg w/ 1 basement.Details
demolish a 3-story, type 5, single family bldg w/ 1 basement. | $8,000 |
| Jul 26, 2019 | Never finaled issued Sep 2022, no final | 3515 Pacific Av | Plath & Company Inc | to erect a 3-story, type 5, single family bldg w/ 2 basements. comply to maher ord# 155-13, route to dph.Details
to erect a 3-story, type 5, single family bldg w/ 2 basements. comply to maher ord# 155-13, route to dph. | $1,800,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 2640 Broadway | Birmingham Builders, Inc | interior remodel at (e) studio room at top floor of (e) single family residence. demo portions of (e) interior walls, removal of 1 interior door. new wall framing, 2 new internal doors. extension of (e) raised platform for (n) configuration of bed. (n) cabinetryDetails
interior remodel at (e) studio room at top floor of (e) single family residence. demo portions of (e) interior walls, removal of 1 interior door. new wall framing, 2 new internal doors. extension of (e) raised platform for (n) configuration of bed. (n) cabinetry | $10,000 |
| Jan 5, 2017 | Completed final sign-off Sep 2017 | 298 Chestnut St | Fontana Construction, Inc., D O T Construction | interior remodel in basement. scope is to install (n) service kitchen to servce adjacent banquet room. work includes (n) equipment, cabinetry hood, & hood exhaust on north exteriorDetails
interior remodel in basement. scope is to install (n) service kitchen to servce adjacent banquet room. work includes (n) equipment, cabinetry hood, & hood exhaust on north exterior | $50,000 |
| Oct 11, 2016 | Never finaled filed Oct 2016, never issued | 2242 Steiner St | Peter Downey Construction Co., Inc. | 75 s.f. ground floor addition (horiz.) at sunrm. no proposed extensions into existing rear or front yard. addition not visible from streetDetails
75 s.f. ground floor addition (horiz.) at sunrm. no proposed extensions into existing rear or front yard. addition not visible from street | $45,000 |
| Sep 8, 2016 | Completed final sign-off May 2019 | 819 Francisco St | D V Rasmussen & Son Inc. | demolish 3-story single family residence.Details
demolish 3-story single family residence. | $10,000 |
| Sep 8, 2016 | Expired or cancelled cancelled Mar 2025 | 819 Francisco St | D V Rasmussen & Son Inc. | construct (n) 3-story single family dwelling residenceDetails
construct (n) 3-story single family dwelling residence | $3,300,000 |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 207 Walnut St | Plath & Company Inc | (4) bathroom and kitchen renovationDetails
(4) bathroom and kitchen renovation | $350,000 |
| Feb 23, 2016 | Completed final sign-off Sep 2017 | 298 Chestnut St | D O T Construction | int. rem'l on 4 flrs: level 1 - (n) powder rm & laundry, level slab. 2nd - remove 1 bath, remodel bedrm, sitting rm; 3rd flr - remodel kitchen, fireplace; 4th flr - remodel master bedrm & study, relocate access door to (e) roof terrace. fill in (e) door & window; 1st flr - replace (e) banquet rmDetails
int. rem'l on 4 flrs: level 1 - (n) powder rm & laundry, level slab. 2nd - remove 1 bath, remodel bedrm, sitting rm; 3rd flr - remodel kitchen, fireplace; 4th flr - remodel master bedrm & study, relocate access door to (e) roof terrace. fill in (e) door & window; 1st flr - replace (e) banquet rm | $75,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2021 | 2111 Hyde St | Peter Downey Construction Co., Inc. | alteration to 2 bathrooms. conversion of closet to powder room. non-bearing partition walls to be moved. 4 doors to be relocated. no window work. no structural work. new fixtures and new tile to be installed. maher naDetails
alteration to 2 bathrooms. conversion of closet to powder room. non-bearing partition walls to be moved. 4 doors to be relocated. no window work. no structural work. new fixtures and new tile to be installed. maher na | $60,000 |
| Sep 10, 2015 | Completed final sign-off Nov 2016 | 784 Bay St | Wolfe Painting Co | comply w/nov #201558541 - remove ground floor illegal rooms and counter sink as per agreement.Details
comply w/nov #201558541 - remove ground floor illegal rooms and counter sink as per agreement. | $1,000 |
| Jul 8, 2015 | Completed final sign-off Apr 2022 | 2650 Hyde St | Cal Am Construction Inc. | remodel to upper unit of 2 unit building. change rear portion of (e) gable roof to flat roof w/ roof deck above. interior remodel of 3rd floor below roof, including remodeled bathroom. new stair to roof. remodel interior stair. new small deck at level 3. ** maher: n/a **Details
remodel to upper unit of 2 unit building. change rear portion of (e) gable roof to flat roof w/ roof deck above. interior remodel of 3rd floor below roof, including remodeled bathroom. new stair to roof. remodel interior stair. new small deck at level 3. ** maher: n/a ** | $125,000 |
| Jul 28, 2014 | Completed final sign-off Feb 2021 | 1100 Sacramento St | Redhorse Constructors Inc. | #1002 -in kind window replacement as noted on plans, subsequent to and associated with pa# 201406097902 for same unit & same location.Details
#1002 -in kind window replacement as noted on plans, subsequent to and associated with pa# 201406097902 for same unit & same location. | $20,000 |
| Jun 9, 2014 | Completed final sign-off Mar 2017 | 1100 Sacramento St | Redhorse Constructors Inc., Peter Downey Construction Co., Inc. | unit #1002:interior remodel of 2-level 10th floor, apartment with new interior balcony and replacement of existing windows excluding street facing windows as indicated on plans.Details
unit #1002:interior remodel of 2-level 10th floor, apartment with new interior balcony and replacement of existing windows excluding street facing windows as indicated on plans. | $400,000 |
| Jan 30, 2014 | Completed final sign-off Jun 2014 | 1100 Sacramento St | Peter Downey Construction Co., Inc. | demolish and off haul certain walls and ceilings and tile floors in apt #1002. no structural work, no window work, no new construction. work to occur on 10th & 11th floor's within the same unit (1002).Details
demolish and off haul certain walls and ceilings and tile floors in apt #1002. no structural work, no window work, no new construction. work to occur on 10th & 11th floor's within the same unit (1002). | $50,000 |
| Sep 27, 2013 | Never finaled issued Nov 2013, no final | 3522 Clay St | Peter Downey Construction Co., Inc. | work will include demolition of an existing fire escape and construct new terraces at levels 2 and 3 entry stairs to be relocated north to close gap against the existing wall.Details
work will include demolition of an existing fire escape and construct new terraces at levels 2 and 3 entry stairs to be relocated north to close gap against the existing wall. | $25,000 |
| Dec 11, 2012 | Completed final sign-off Oct 2013 | 2755 Fillmore St | The Toboni Group | revision to 201212045405: revise existing 1 hour glass guardrail to tempered glass.Details
revision to 201212045405: revise existing 1 hour glass guardrail to tempered glass. | |
| Nov 9, 2012 | Completed final sign-off Feb 2016 | 2250 Vallejo St | Nova Designs Builds Inc, R M Builders | interior alterations, interior seismic upgrade. exterior alteration, add new garage, driveway on west side and east infill below (e) stair overhang. units merged uner pa# 2011/11/17/9172.Details
interior alterations, interior seismic upgrade. exterior alteration, add new garage, driveway on west side and east infill below (e) stair overhang. units merged uner pa# 2011/11/17/9172. | $750,000 |
| Jun 7, 2012 | Expired or cancelled expired Dec 2017 | 2626 Larkin St | D O T Construction | revision to pa# 2008/09/26/2740. enlarge previous approved roof deck (w00d) & change non-combustible concrete pavers, add new solid parapet & glass rail, reconfigure stair to deck & remove penthouse.Details
revision to pa# 2008/09/26/2740. enlarge previous approved roof deck (w00d) & change non-combustible concrete pavers, add new solid parapet & glass rail, reconfigure stair to deck & remove penthouse. | $5,000 |
| Apr 29, 2009 | Completed final sign-off Jun 2011 | 2298 Pacific Av | unit 3 - partial renovation of a full floor condo unit interior. restore existing enclosed, unconditioned terrace to original open air terrace. no structural work. no window work. no chang in use of square footage.Details
unit 3 - partial renovation of a full floor condo unit interior. restore existing enclosed, unconditioned terrace to original open air terrace. no structural work. no window work. no chang in use of square footage. | $375,000 | |
| Sep 26, 2008 | Expired or cancelled expired Dec 2017 | 2626 Larkin St | D O T Construction, P B Realty Investments Inc | to erect a new four story two family dwelling unit.Details
to erect a new four story two family dwelling unit. | $4,200,000 |
| Sep 26, 2008 | Expired or cancelled expired Dec 2017 | 2626 Larkin St | P B Realty Investments Inc | to demolish a three story two family dwelling unit.Details
to demolish a three story two family dwelling unit. | $10,000 |
| May 16, 2008 | Never finaled issued May 2008, no final | 2310 Broadway | Peter Downey Construction Co., Inc. | revision to pa# 2008/02/15/4941: primary lighting and electrical revisions. interior: reconfigure (e) lighting and electric. exterior: replace (e) entry path lights, add gas heaters at deck. add front facade lights. delete 2 closets.Details
revision to pa# 2008/02/15/4941: primary lighting and electrical revisions. interior: reconfigure (e) lighting and electric. exterior: replace (e) entry path lights, add gas heaters at deck. add front facade lights. delete 2 closets. | $12,000 |
| Apr 18, 2008 | Expired or cancelled expired Feb 2010 | 3522 Clay St | Peter Downey Construction Co., Inc. | enclose a room under (e) deck, rework & extend (e) rear stairs. renovate kitchen, re-configure (e) ground floor rooms. replace (e) family room (rear) windows and doors.Details
enclose a room under (e) deck, rework & extend (e) rear stairs. renovate kitchen, re-configure (e) ground floor rooms. replace (e) family room (rear) windows and doors. | $75,000 |
| Jan 10, 2007 | Expired or cancelled expired Jan 2009 | 298 Chestnut St | Redhorse Constructors Inc. | revision pa# 200602285576-trellis at rear.Details
revision pa# 200602285576-trellis at rear. | |
| Nov 20, 2006 | Completed final sign-off Sep 2007 | 2259 Clay St | remodel (e) kitchen & 2 baths, replace (e) windows with new to match where noted on plans in (e) location. u-value less than .67.Details
remodel (e) kitchen & 2 baths, replace (e) windows with new to match where noted on plans in (e) location. u-value less than .67. | $125,000 | |
| Oct 16, 2006 | Completed final sign-off Mar 2007 | 298 Chestnut St | Redhorse Constructors Inc. | renew pa# 2004/12/23/2086, pa# 2005/05/26/3547 & pa# 2005/09/15/3016 for final inspection.Details
renew pa# 2004/12/23/2086, pa# 2005/05/26/3547 & pa# 2005/09/15/3016 for final inspection. | |
| Sep 11, 2006 | Completed final sign-off Sep 2007 | 3699 Washington St | horizontal extension to infill portion of (e) second floor deck (29 s.f. total added) previously approved under app #9921752-r1 but not previously startedDetails
horizontal extension to infill portion of (e) second floor deck (29 s.f. total added) previously approved under app #9921752-r1 but not previously started | $50,000 | |
| Aug 15, 2006 | Expired or cancelled expired Dec 2008 | 66 Montclair Tr | structural addendum to permit # 200606133938. 1) additional structural details. 2) detail in elevator shaft and pit.Details
structural addendum to permit # 200606133938. 1) additional structural details. 2) detail in elevator shaft and pit. | ||
| Jun 13, 2006 | Expired or cancelled expired Dec 2008 | 66 Montclair Tr | add 1 elevator and mechanical roomDetails
add 1 elevator and mechanical room | $24,000 | |
| Feb 28, 2006 | Expired or cancelled expired Jan 2009 | 298 Chestnut St | Redhorse Constructors Inc. | landscape addition/renovations. rear yard: install trellis (150 sq ft, 8' high max). install steps, handrail, planter walls, paving, and fountain.Details
landscape addition/renovations. rear yard: install trellis (150 sq ft, 8' high max). install steps, handrail, planter walls, paving, and fountain. | $25,000 |
| Feb 6, 2006 | Completed final sign-off Mar 2007 | 298 Chestnut St | Redhorse Constructors Inc. | landscape addition / renovations; front yard; replace (e) retaining wall. install new paving, balustrade, handrails & stairs.Details
landscape addition / renovations; front yard; replace (e) retaining wall. install new paving, balustrade, handrails & stairs. | $30,000 |
| Sep 15, 2005 | Expired or cancelled expired Jan 2009 | 298 Chestnut St | Redhorse Constructors Inc. | vertical addition -replace (e) gte with (n) motorized, in-swing metal gate.remove (e) solarium structure.Details
vertical addition -replace (e) gte with (n) motorized, in-swing metal gate.remove (e) solarium structure. | $40,000 |