Viet Troung
- License
- C37240
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- May 2019 to Jan 2025
4 permits since 2000 (architect on 4 permits): 2 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Yerba Buena Builders Inc (2), Jesus Henriquez
- Engineers
- Anthony Dente (2), Ken Guan
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 9, 2025 | In progress issued May 2025 | 158 Flood Av | Jesus Henriquez | ground fl - add 2 bedrms, add 1 bathrm, media/gym room & laundry @ ground fl; 2nd fl - (e) kitchen to be renovated, relocate interior stairs to other side of house; improve the rear deck increasing 885 sf of conditioned spaceDetails
ground fl - add 2 bedrms, add 1 bathrm, media/gym room & laundry @ ground fl; 2nd fl - (e) kitchen to be renovated, relocate interior stairs to other side of house; improve the rear deck increasing 885 sf of conditioned space | $150,000 |
| Dec 14, 2023 | Completed final sign-off Nov 2024 | 145 Missouri St | Yerba Buena Builders Inc | revision to apprvoed pa 2022-0516-4293 to make rear deck wall solid first 42", remove rear door and overhang that is over property lineDetails
revision to apprvoed pa 2022-0516-4293 to make rear deck wall solid first 42", remove rear door and overhang that is over property line | |
| May 16, 2022 | Completed final sign-off Nov 2024 | 145 Missouri St | Yerba Buena Builders Inc | correct nov#201808381, for rear porch deck that is built in kind over the property line. rear porch deck will be built to observe property line.per variance decision(2019-007159var), privacy screen will also be built to preserve the rear neighbor's privacy.Details
correct nov#201808381, for rear porch deck that is built in kind over the property line. rear porch deck will be built to observe property line.per variance decision(2019-007159var), privacy screen will also be built to preserve the rear neighbor's privacy. | $5,000 |
| May 3, 2019 | Expired or cancelled withdrawn May 2022 | 145 Missouri St | comply with nov#201808381. drawings document work previously completed at the rear deck. minor additional work to address nov correctionDetails
comply with nov#201808381. drawings document work previously completed at the rear deck. minor additional work to address nov correction | $15,000 |