Val Pizzini
- License
- CE29603
- Professional engineer; the board does not list CE as a license type, so the discipline cannot be read from the number
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up CE29603 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Based in
- Santa Rosa
- On San Francisco permits
- Jan 2012 to Sep 2014
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2014 | Completed final sign-off Jul 2016 | 254 20th Av | 234 sq. ft. heated to ground level under (e) deck. 219 sq. ft. addition for kitchen main level. 430 sq. ft. master bedroom addition upper level.Details
234 sq. ft. heated to ground level under (e) deck. 219 sq. ft. addition for kitchen main level. 430 sq. ft. master bedroom addition upper level. | $147,000 | |
| Dec 21, 2012 | Completed final sign-off Sep 2014 | 838 35th Av | create 850 sqft. family rm, laundry & bath from (e) rear storage area of garage. expand main level to rear by 64 sqft for stairway down. rear horizontal.Details
create 850 sqft. family rm, laundry & bath from (e) rear storage area of garage. expand main level to rear by 64 sqft for stairway down. rear horizontal. | $95,250 | |
| May 21, 2012 | Completed final sign-off Oct 2013 | 1790 08th Av | construct 3-sided laminated glass windscreen connected to a 42" high parapet/guardrail to protect a 200 sq ft (e) balcony on front of residence.Details
construct 3-sided laminated glass windscreen connected to a 42" high parapet/guardrail to protect a 200 sq ft (e) balcony on front of residence. | $6,800 | |
| Jan 13, 2012 | Completed final sign-off Jan 2013 | 29 Lake Forest Ct | kitchen remodel. reconfigure e interior stairway to code complying. remove 1 interior wall. all work per plans.Details
kitchen remodel. reconfigure e interior stairway to code complying. remove 1 interior wall. all work per plans. | $41,000 |