Tyler Shawn Slous
- Listed as
- engineer
- On San Francisco permits
- Jun 2025 to May 2026
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2026 | Completed final sign-off Aug 2026 | 2133 Balboa St | Bail Construction | replace interior bearing wall in garage with new steel beamDetails
replace interior bearing wall in garage with new steel beam | $18,000 |
| Jun 5, 2025 | Completed final sign-off Nov 2025 | 1884 Church St | Sergio E Rodriguez Llc Dba Integrum Cons | interior remodel on (e) top fl. bathroom and bedroom electrical and plumbing alterations minor structural changes interior work onlyDetails
interior remodel on (e) top fl. bathroom and bedroom electrical and plumbing alterations minor structural changes interior work only | $50,000 |