Tony L Cheung
- Listed as
- architect, authorized agent-others, engineer
- On San Francisco permits
- Jun 2014 to Jul 2025
16 permits since 2000 (engineer on 12 permits, architect on 3 permits, authorized agent-others on 1 permit): 14 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 426 Hugo St | Atlantic Construction Co Inc | remodel kitchen on #428 floor level 3. remodel hallway bath and half bath on #428 floor level. remove (e) fireplace in dining room on #428 floor level. install new electrical control and lighting thru out #428 floor level.Details
remodel kitchen on #428 floor level 3. remodel hallway bath and half bath on #428 floor level. remove (e) fireplace in dining room on #428 floor level. install new electrical control and lighting thru out #428 floor level. | $45,000 |
| Dec 6, 2024 | In progress issued Jan 2025 | 2310 18th Av | 1) add office, bathroom and family room on the ground fl. 2) install new electrical lighting and controls on the ground level 3) re-configured (e) hall bath and closet into new hall bath and master #1 on the 2nd level 4) remodel kitchen on the 2nd fl. level 5) install new elec lighting and controlsDetails
1) add office, bathroom and family room on the ground fl. 2) install new electrical lighting and controls on the ground level 3) re-configured (e) hall bath and closet into new hall bath and master #1 on the 2nd level 4) remodel kitchen on the 2nd fl. level 5) install new elec lighting and controls | $150,000 | |
| Dec 9, 2022 | Completed final sign-off Mar 2023 | 5915 Geary Bl | Cal - Pacific Constr. Inc. | add (1) partition wall, add sliding steel gate @ front of storeDetails
add (1) partition wall, add sliding steel gate @ front of store | $5,000 |
| Feb 2, 2021 | Completed final sign-off Apr 2022 | 426 Hugo St | Atlantic Construction Co Inc | remodel kitchen in uint 426. remove esisting staircase & infill opening. remodel 2 bathrooms. replace all windows in unit 426, except window facing street. install electric and lighting. install new drywall & insullation. re-configurate existing bedroom #4 into new dining rm & dining into bedrmDetails
remodel kitchen in uint 426. remove esisting staircase & infill opening. remodel 2 bathrooms. replace all windows in unit 426, except window facing street. install electric and lighting. install new drywall & insullation. re-configurate existing bedroom #4 into new dining rm & dining into bedrm | $150,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2021 | 2501 47th Av | Alvarez Construction & Tile, Inc | add storage room & bathroom on ground fl. install new electrical, controls & lighting on ground fl.Details
add storage room & bathroom on ground fl. install new electrical, controls & lighting on ground fl. | $15,000 |
| Sep 8, 2020 | Completed final sign-off Oct 2020 | 1401 Sloat Bl | Atlantic Construction Co Inc | revision to pa# 202001222475: kitchen on the ground fl, removing 1 non-structural wall. master bathroom on the 2nd fl removing 1 non-structural wall.Details
revision to pa# 202001222475: kitchen on the ground fl, removing 1 non-structural wall. master bathroom on the 2nd fl removing 1 non-structural wall. | $6,000 |
| Feb 7, 2020 | Completed final sign-off Jan 2021 | 818 40th Av | install new electrical, lighting & controls in bedrooms, hallway, dining room & living room; install new 2x4 skylights in hallway. new drywall in bedrooms hallway, dining room & living room; remove (e) fireplace. remove partial wall & new paint on 2nd flDetails
install new electrical, lighting & controls in bedrooms, hallway, dining room & living room; install new 2x4 skylights in hallway. new drywall in bedrooms hallway, dining room & living room; remove (e) fireplace. remove partial wall & new paint on 2nd fl | $8,000 | |
| Sep 27, 2019 | Completed final sign-off Nov 2020 | 1411 39th Av | Atlantic Construction Co Inc | reconfigure bedroom 1 closet into (n) master bathrm and bedrm closet; (e) hall bathrm to new 1/2 bath; remove (e) 2x4 skylight and add 1 skylight; (e) kitchen and breakfast nook into (n) kitchen; gr fl - add bedroom #2 and #3, bath and family rm & storage; new lighting & controls throughout;Details
reconfigure bedroom 1 closet into (n) master bathrm and bedrm closet; (e) hall bathrm to new 1/2 bath; remove (e) 2x4 skylight and add 1 skylight; (e) kitchen and breakfast nook into (n) kitchen; gr fl - add bedroom #2 and #3, bath and family rm & storage; new lighting & controls throughout; | $90,000 |
| May 25, 2018 | Completed final sign-off Jul 2019 | 2187 28th Av | Hung's General Construction | legalize bathroom on 2nd floor level & add 2 closets in nw master bedroom. add nw master bedroom, master bathroom, media room, 2nd bathroom & storage on the ground level. install new lighting & control through out ground floor. install nw electrical throughout ground fl. remove 4 extg windows onDetails
legalize bathroom on 2nd floor level & add 2 closets in nw master bedroom. add nw master bedroom, master bathroom, media room, 2nd bathroom & storage on the ground level. install new lighting & control through out ground floor. install nw electrical throughout ground fl. remove 4 extg windows on | $60,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2019 | 5636 Anza St | remodel kitchen and bathroom on 2nd fl. new interior paint on 2nd fl. new exterior paint on entire house.Details
remodel kitchen and bathroom on 2nd fl. new interior paint on 2nd fl. new exterior paint on entire house. | $30,000 | |
| May 5, 2017 | Expired or cancelled expired Dec 2025 | 263 Naples St | J P E Construction | eliminate clst, reconfig hallway bath to create 1 hallway bath,1 mstr bath 2nd fl.remodel kitchen, new lighting and controls. drywall, paint, enclose fireplace,add bookshlf,windws 2nd lvel except strt facing,update elc, plumb, gr fl remodel bdrm,office, 1 full bathDetails
eliminate clst, reconfig hallway bath to create 1 hallway bath,1 mstr bath 2nd fl.remodel kitchen, new lighting and controls. drywall, paint, enclose fireplace,add bookshlf,windws 2nd lvel except strt facing,update elc, plumb, gr fl remodel bdrm,office, 1 full bath | $65,000 |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 1215 37th Av | J P E Construction | remodel 2 kitchens and 2 baths.Details
remodel 2 kitchens and 2 baths. | $30,000 |
| Jan 8, 2016 | Completed final sign-off May 2016 | 2543 39th Av | J P E Construction | remodel kitchen, add one skylight in kitchen.Details
remodel kitchen, add one skylight in kitchen. | $15,000 |
| Jan 9, 2015 | Completed final sign-off Dec 2015 | 249 Sweeny St | remove existing storage room on ground floor. add new family room, home office & bathroom on ground floor.Details
remove existing storage room on ground floor. add new family room, home office & bathroom on ground floor. | $35,000 | |
| Jan 9, 2015 | Completed final sign-off Sep 2015 | 566 48th Av | J P E Construction | remodeling kitchen,& 3 bathroom remodeling on 2nd & 3rd floor. replace all windows & sliding doors.Details
remodeling kitchen,& 3 bathroom remodeling on 2nd & 3rd floor. replace all windows & sliding doors. | $80,000 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 812 32nd Av | Kwok Pun Leung Const. Co ***Check I D** | add new family room & new half bath in the ground floor. addition would be part of 812 - 32nd ave.Details
add new family room & new half bath in the ground floor. addition would be part of 812 - 32nd ave. | $20,000 |