Tomas Fernanez
- License
- 78876
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Aug 2022 to May 2026
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- R De Leon Construction (2), Castillo General Remodel, Palo Alto Home Improvements Inc
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | In progress issued May 2026 | 1442 Sanchez St | R De Leon Construction | voluntory structural strengthening. bolt down framing to (e) foundation, install interior shear walls. and install simpson hardware to strengthen seismic work.Details
voluntory structural strengthening. bolt down framing to (e) foundation, install interior shear walls. and install simpson hardware to strengthen seismic work. | $50,000 |
| Jun 9, 2025 | Completed final sign-off Aug 2025 | 285 12th Av | R De Leon Construction | bath remodel with floor plan alteration. change current bathroom from 3'x 7' to 6'x 7'. install new shower. toilet location will remain. vanity location will be different. new walk in tile shower with shower panDetails
bath remodel with floor plan alteration. change current bathroom from 3'x 7' to 6'x 7'. install new shower. toilet location will remain. vanity location will be different. new walk in tile shower with shower pan | $30,000 |
| Oct 27, 2023 | Completed final sign-off Sep 2024 | 4225 Balboa St | Castillo General Remodel | interior remodel by openning up ktchen wall. add skylights. enclose light court.Details
interior remodel by openning up ktchen wall. add skylights. enclose light court. | $9,000 |
| Aug 24, 2022 | Completed final sign-off Jul 2025 | 309 Castro St | Palo Alto Home Improvements Inc | replace foundation, re-framing of walls on first floor, replace window thoughout first floor like for like, re-wire & new lighting first floor, windows hvac unit installation.Details
replace foundation, re-framing of walls on first floor, replace window thoughout first floor like for like, re-wire & new lighting first floor, windows hvac unit installation. | $100,000 |