Tomas Fernandez
- Listed as
- engineer
- Firm
- Tomas A Fernandez, P.E.
- On San Francisco permits
- Feb 2014 to Jul 2026
15 permits since 2000 (engineer on 15 permits): 8 completed, 4 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2026 | In progress issued Aug 2026 | 24 Ord St | Castillo General Remodel | new front door, partial kitchen remodel, bathroom remodel like to like, powder room additionDetails
new front door, partial kitchen remodel, bathroom remodel like to like, powder room addition | $30,000 |
| Jun 13, 2025 | In progress issued Nov 2025 | 158 Burnside Av | flip location of vanity toilet ref 202504214843Details
flip location of vanity toilet ref 202504214843 | $500 | |
| Sep 30, 2024 | In progress issued Mar 2025 | 158 Burnside Av | Current Construction | install new windows on the west elevation. reframe as shown. install waterproofing and stucco on west elevation. install 1 new skylight above (e) kitchen. remove and repair (e) deck (less than 50%) outside kitchen. all proposed work at rear of house.Details
install new windows on the west elevation. reframe as shown. install waterproofing and stucco on west elevation. install 1 new skylight above (e) kitchen. remove and repair (e) deck (less than 50%) outside kitchen. all proposed work at rear of house. | $100,000 |
| Aug 29, 2024 | In progress issued Aug 2024 | 1835 Franklin St | Rs Painting Inc | unit 702; installing new laundry unit inside unit. with new plumbing. installing two new shower valves and retile at both bathrooms.Details
unit 702; installing new laundry unit inside unit. with new plumbing. installing two new shower valves and retile at both bathrooms. | $5,000 |
| May 16, 2023 | Completed final sign-off Jul 2025 | 309 Castro St | Palo Alto Home Improvements Inc | revision to 202302152022: framing revision detail for underfloor framingDetails
revision to 202302152022: framing revision detail for underfloor framing | $1,000 |
| Feb 15, 2023 | Completed final sign-off Jul 2025 | 309 Castro St | Palo Alto Home Improvements Inc | unit a: revision to existing permit 202208241204. alter sdi due to existing site condition.Details
unit a: revision to existing permit 202208241204. alter sdi due to existing site condition. | |
| Nov 29, 2022 | Completed final sign-off Jul 2025 | 309 Castro St | Palo Alto Home Improvements Inc | revision to pa#2022-0824-1204, shoring plans and structural detailsDetails
revision to pa#2022-0824-1204, shoring plans and structural details | $10,000 |
| Mar 10, 2022 | Completed final sign-off Jan 2023 | 761 Panorama Dr | Expressions General Remodel | remodel of rear portion of (e) g/f. build a bathroom, laundry & bedroom in ground floor. add new windows (alum clad wood) on south side. minor (n) flr framing an dsingle conc. pad ftg.Details
remodel of rear portion of (e) g/f. build a bathroom, laundry & bedroom in ground floor. add new windows (alum clad wood) on south side. minor (n) flr framing an dsingle conc. pad ftg. | $40,000 |
| Sep 16, 2021 | Completed final sign-off May 2023 | 2815 Bush St | Ams Construction | structural revision of pa 201905150770.Details
structural revision of pa 201905150770. | |
| Oct 20, 2020 | Never finaled filed Oct 2020, never issued | 64 Marietta Dr | Gcsf Pavers & Landscape Inc | build a rear yard retaining wall. spec 44 in ft, 4' 6" height. foundation cantilever.Details
build a rear yard retaining wall. spec 44 in ft, 4' 6" height. foundation cantilever. | $20,000 |
| Jun 18, 2019 | Never finaled filed Jun 2019, never issued | 62 Bronte St | deck, railing & stairs at rear.Details
deck, railing & stairs at rear. | $5,000 | |
| Oct 13, 2015 | Completed final sign-off Jul 2016 | 60 College Av | modify e interior walls. remodel kitchen and bath. add bedroom, 2.5 baths. replace all windows. repair and replace dryrot/termite damaged exterior walls at rear and sides, reoof at north/east rear. replace slab. new balconyDetails
modify e interior walls. remodel kitchen and bath. add bedroom, 2.5 baths. replace all windows. repair and replace dryrot/termite damaged exterior walls at rear and sides, reoof at north/east rear. replace slab. new balcony | $100,000 | |
| Nov 19, 2014 | Never finaled issued Dec 2014, no final | 707 Bay Shore Bl | Able Signs Inc. | erect an electric wall single faced sign (b) ashley furniture; maher n/aDetails
erect an electric wall single faced sign (b) ashley furniture; maher n/a | $2,000 |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 1375 Sacramento St | Sequoia Construction Services Inc | #1- kitchen remodel like for like configuration of cabinets. bath remodel in kind configuration. bedroom closet and entrance door relocation from hall to bedroom. add partition wall to form family roomDetails
#1- kitchen remodel like for like configuration of cabinets. bath remodel in kind configuration. bedroom closet and entrance door relocation from hall to bedroom. add partition wall to form family room | $30,000 |
| Feb 14, 2014 | Completed final sign-off Oct 2014 | 3550 Market St | Shaum Mehra Construction | revision to pa 2014/0108/5865. to replace wooden post with a steel post (3 1/2 x 3 1/2), per plan.Details
revision to pa 2014/0108/5865. to replace wooden post with a steel post (3 1/2 x 3 1/2), per plan. |