Tipping Mar
- License
- 53951
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Based in
- Berkeley
- On San Francisco permits
- Feb 2012 to Feb 2012
3 permits since 2000 (engineer on 3 permits): 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Webcor Construction Lp (3)
- Engineers
- Soha Engineers (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 2 of 3 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2012 | Never finaled issued Apr 2012, no final | 525 Golden Gate Av | Webcor Construction Lp | install 152 micro piles (deep foundation) located at 2 future concrete cores. 2009-puc-002Details
install 152 micro piles (deep foundation) located at 2 future concrete cores. 2009-puc-002 | $110,000,000 |
| Feb 27, 2012 | Never finaled issued Apr 2012, no final | 525 Golden Gate Av | Webcor Construction Lp | tower crane foundation work. 2010-puc-004Details
tower crane foundation work. 2010-puc-004 | $24,212 |
| Feb 27, 2012 | Never finaled issued Apr 2012, no final | 525 Golden Gate Av | Webcor Construction Lp | new 14 story class "a" office building, consist of concrete superstructure with 2 concrete post-tensioned cores including post tensioned floors. sub-sidewalk pge vault and outdoor play area for child care center & is slated to achieve leed platinum status.Details
new 14 story class "a" office building, consist of concrete superstructure with 2 concrete post-tensioned cores including post tensioned floors. sub-sidewalk pge vault and outdoor play area for child care center & is slated to achieve leed platinum status. | $110,000,000 |