Thomas Reay
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Omni Design Group
- Based in
- San Luis Obispo
- On San Francisco permits
- Nov 2004 to Feb 2020
6 permits since 2000 (architect on 4 permits, authorized agent-others on 1 permit, engineer on 1 permit): 4 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2020 | Expired or cancelled cancelled Jan 2023 | 1740 Broadway | Ridge Communications Inc | verizon: upgrade technologies at e telelcomm facility. consisting of remove and replace antennas, nstall frp chemney redomes, install support equip on building walls and roof. remove unuses mounts, install additional cable trays maher not reqDetails
verizon: upgrade technologies at e telelcomm facility. consisting of remove and replace antennas, nstall frp chemney redomes, install support equip on building walls and roof. remove unuses mounts, install additional cable trays maher not req | $20,000 |
| Jul 19, 2018 | Expired or cancelled cancelled Nov 2024 | 150 Executive Park Bl | verizon wireless proposes the following modifications for an extg telecom facility. remove and replace 6 extg antennas on bldg rooftop, remove and replace 4 rru's from bldg rooftop.Details
verizon wireless proposes the following modifications for an extg telecom facility. remove and replace 6 extg antennas on bldg rooftop, remove and replace 4 rru's from bldg rooftop. | $15,000 | |
| Aug 26, 2016 | Completed final sign-off Feb 2018 | 832 Folsom St | C I K Power Distributors, Llc | verizon wireless proposes to upgrade an (e) wts. remove(11) (e) panel antennas & install (10) (n) panel antennas; remove (4)(e)radio units & install (10) (n) rrus32 radio units; install (2)(n) diplexes @ antennas & (3)in shelter; install(3)(n) hybrid cables w/(n) surge suppression units @ each endDetails
verizon wireless proposes to upgrade an (e) wts. remove(11) (e) panel antennas & install (10) (n) panel antennas; remove (4)(e)radio units & install (10) (n) rrus32 radio units; install (2)(n) diplexes @ antennas & (3)in shelter; install(3)(n) hybrid cables w/(n) surge suppression units @ each end | $15,000 |
| Oct 11, 2012 | Completed final sign-off Mar 2013 | 1431 San Bruno Av | E S Inc Dba Energy Systems | install 1 new 30 kw backup diesel generator on new slab. install new automatic transfer switch.Details
install 1 new 30 kw backup diesel generator on new slab. install new automatic transfer switch. | $30,000 |
| Oct 1, 2010 | Completed final sign-off Jul 2011 | 1800 Sutter St | Jfc Construction Inc. | installation of metro pcs wireless facility. 4 equipment cabinets on porposed steel platform on building roof. 3 panel antennas on (e) building. power & telco service to equipment. 1 gps antenna mounted to proposed power rack; coax runs from equipment to antennas.Details
installation of metro pcs wireless facility. 4 equipment cabinets on porposed steel platform on building roof. 3 panel antennas on (e) building. power & telco service to equipment. 1 gps antenna mounted to proposed power rack; coax runs from equipment to antennas. | $60,000 |
| Nov 3, 2004 | Completed final sign-off Feb 2005 | 3627 17th St | Bussard & Son Construction | correct nov 200451789- items 1 - 6, 1st flight of staircase only (less than 50 percent) repair ceiliDetails
correct nov 200451789- items 1 - 6, 1st flight of staircase only (less than 50 percent) repair ceili | $2,500 |