Thomas Lee
- License
- 8700
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Belden Consulting Engineers
- Based in
- Dublin
- On San Francisco permits
- Sep 2011 to Sep 2011
1 permit since 2000 (engineer on 1 permit): 1 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mc Nely Construction Company
- Architects
- James Goring
- Engineers
- David Murphy
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2011 | Completed final sign-off Apr 2015 | 401 Taraval St | Mc Nely Construction Company | convert b occ. bldg to a-3 occ. seismic retrofit, structural reinforcement of occupied fl, modify main entrance to create accessible lobby & elevator, replace hvac system review title 24, replace elevator to comply w/ada standards, reconfigure interior partition layout to adopt to proposed use.Details
convert b occ. bldg to a-3 occ. seismic retrofit, structural reinforcement of occupied fl, modify main entrance to create accessible lobby & elevator, replace hvac system review title 24, replace elevator to comply w/ada standards, reconfigure interior partition layout to adopt to proposed use. | $1,700,000 |