Tagui Queen Belajian
- Listed as
- contractor, designer
- Firm
- Tagg Design & Build Inc
- Based in
- Granada Hills
- On San Francisco permits
- Sep 2025 to Sep 2025
2 permits since 2000 (contractor on 2 permits, designer on 1 permit): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- My Construction Group Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 460 Francisco St | Tagg Design & Build Inc | revision to 202509044577, add non structural wall, extend partial pony wall to ceiling, extend shower pan, add 8 recessed lights, move thermostat and outlet, like for like toilet replacement, replace kitchen and bath countertops, upgrade all necessary receptacles to gfci, upgrade flooring to vinylDetails
revision to 202509044577, add non structural wall, extend partial pony wall to ceiling, extend shower pan, add 8 recessed lights, move thermostat and outlet, like for like toilet replacement, replace kitchen and bath countertops, upgrade all necessary receptacles to gfci, upgrade flooring to vinyl | $30,000 |
| Sep 4, 2025 | In progress issued Sep 2025 | 460 Francisco St | My Construction Group Inc, Tagg Design & Build Inc | unit 101: like for like shower.replace 6 recessed lights, repair drywall w/ 5/8" type x sheetrock, and 2 outlets.Details
unit 101: like for like shower.replace 6 recessed lights, repair drywall w/ 5/8" type x sheetrock, and 2 outlets. | $13,000 |