Syed Khader
- Listed as
- engineer
- Firm
- Syed Adnan Khader
- Based in
- Fremont
- On San Francisco permits
- Apr 2023 to Jul 2026
7 permits since 2000 (engineer on 7 permits): 4 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 884 Foerster St | extension of upper & lower floors with new adu at lower floor. remodel of upper floor kitchen. replace (e) deck & stairs on both floors.Details
extension of upper & lower floors with new adu at lower floor. remodel of upper floor kitchen. replace (e) deck & stairs on both floors. | $240,000 | |
| Mar 5, 2026 | In progress issued Jun 2026 | 553 Gates St | revision to pa 202402296863 add/expand window at facade & on south side of home. bathroom layout revision, no change in plumbing fixturesDetails
revision to pa 202402296863 add/expand window at facade & on south side of home. bathroom layout revision, no change in plumbing fixtures | $20,000 | |
| Mar 27, 2024 | Completed final sign-off Nov 2024 | 42 Clairview Ct | Slick Construction | kitchen remodel with wall removal; relocate fridge, sink, dishwasher; install new cabinets. new recess lights; replace floor in kitchen area; install sister for ceiling joistDetails
kitchen remodel with wall removal; relocate fridge, sink, dishwasher; install new cabinets. new recess lights; replace floor in kitchen area; install sister for ceiling joist | $65,000 |
| Feb 29, 2024 | In progress issued Apr 2024 | 553 Gates St | remodel kitchen. remove interior wall separating kitchen and living room replace beam, counters, and cabinets. remodel bath, move location of toilet.Details
remodel kitchen. remove interior wall separating kitchen and living room replace beam, counters, and cabinets. remodel bath, move location of toilet. | $24,000 | |
| Nov 28, 2023 | Completed final sign-off Dec 2024 | 261 Texas St | replace existing door and window with bi-folding door. no change to size of opening. all work on 2nd floorDetails
replace existing door and window with bi-folding door. no change to size of opening. all work on 2nd floor | $1,900 | |
| May 5, 2023 | Completed final sign-off Oct 2023 | 72 Valmar Tr | Best Value Home Improvements | interior remodel: demolition of load bearing wall. placement of engineering beam to support the roof load. kitchen remodelDetails
interior remodel: demolition of load bearing wall. placement of engineering beam to support the roof load. kitchen remodel | $30,000 |
| Apr 14, 2023 | Completed final sign-off Jul 2023 | 3618 16th St | remove 2 posts in the garage and replace existing wood support beam with 9 steel one.Details
remove 2 posts in the garage and replace existing wood support beam with 9 steel one. | $15,000 |