Suzanne Stadler
- License
- C27500
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C27500 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Stadler & Architecture
- On San Francisco permits
- May 2006 to Aug 2021
8 permits since 2000 (architect on 7 permits, engineer on 1 permit): 6 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Joseph Francis Lockary (3), Scott & Warner Builders Inc (2), Zone 4 Power Inc
- Engineers
- Alex Rood (3)
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2021 | Completed final sign-off Jun 2022 | 265 Shotwell St | Zone 4 Power Inc | revision to pa 202010287606 issued on 6/30/21 to include the built-out of 2 gender neutral bathrooms and a trash closetDetails
revision to pa 202010287606 issued on 6/30/21 to include the built-out of 2 gender neutral bathrooms and a trash closet | $50,000 |
| Oct 28, 2020 | Completed final sign-off Jun 2022 | 265 Shotwell St | 1st time ti buildout of warm shell, tenant space "b" of the 1st & 2nd flr of a mixed use project at 2060 folsom (pa #201608054294) for office and meeting rooms for 2 sf non-profit organizations, youth speaks, & first exposures.Details
1st time ti buildout of warm shell, tenant space "b" of the 1st & 2nd flr of a mixed use project at 2060 folsom (pa #201608054294) for office and meeting rooms for 2 sf non-profit organizations, youth speaks, & first exposures. | $1,000,000 | |
| Jun 20, 2019 | Never finaled filed Jun 2019, never issued | 240 Page St | interior renovation, repair remodel voluntary seismic upgrade, repair renovation of stained glass windowsDetails
interior renovation, repair remodel voluntary seismic upgrade, repair renovation of stained glass windows | $1,100,000 | |
| Sep 13, 2016 | Completed final sign-off Apr 2018 | 120 28th St | Joseph Francis Lockary | remodel of upper unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating.Details
remodel of upper unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating. | $120,000 |
| Sep 13, 2016 | Completed final sign-off Apr 2018 | 120 28th St | Joseph Francis Lockary | addition of (n) deck and stairs.Details
addition of (n) deck and stairs. | $30,000 |
| Sep 13, 2016 | Completed final sign-off Feb 2018 | 122 28th St | Joseph Francis Lockary | remodel of lower unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating.Details
remodel of lower unit in (2) unit condominium. relocate kitchen and bath, (n) windows/doors, (n) heating. | $80,000 |
| Dec 16, 2008 | Completed final sign-off Nov 2009 | 273 Page St | Scott & Warner Builders Inc | reduction of scope of work to eliminate previously permitted b occupancy. no excavation of basement. orig app 200605020407Details
reduction of scope of work to eliminate previously permitted b occupancy. no excavation of basement. orig app 200605020407 | |
| May 2, 2006 | Expired or cancelled expired Nov 2009 | 273 Page St | Scott & Warner Builders Inc | general improvement to life safety, full sprinkler, fa system, partial excavation of basement for accessory b occupancy, ramp from rose alley to b occupancy, special access lift to b occupancy, partial replacement of foundationDetails
general improvement to life safety, full sprinkler, fa system, partial excavation of basement for accessory b occupancy, ramp from rose alley to b occupancy, special access lift to b occupancy, partial replacement of foundation | $1,000,000 |