Suppayarn Dechpormsuk
- Listed as
- architect, engineer
- On San Francisco permits
- Apr 2021 to Jul 2023
11 permits since 2000 (engineer on 10 permits, architect on 1 permit): 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 12, 2023 | In progress issued Oct 2023 | 126 Grattan St | Gem Home Improvements Inc | created vaulted ceilings on third floor. no exterior work proposed(yards,facades, roof or any other). no changes to layout and/or fenestration proposed. no changes to gross or condition area proposed. no plubming, elect and/or mech work proposed.Details
created vaulted ceilings on third floor. no exterior work proposed(yards,facades, roof or any other). no changes to layout and/or fenestration proposed. no changes to gross or condition area proposed. no plubming, elect and/or mech work proposed. | $14,000 |
| Feb 7, 2023 | Completed final sign-off May 2025 | 780 Darien Wy | Globus Builder Inc | to comply with nov#202303044, provide shoring for trench open on east side exterior of building. approx 20 cuyd excavationDetails
to comply with nov#202303044, provide shoring for trench open on east side exterior of building. approx 20 cuyd excavation | $1,150 |
| Jan 13, 2023 | Completed final sign-off Jun 2023 | 527 42nd Av | comply with nov #202297886, remove damaged retaining wall adjacent to rear property line in rear yard. rear yard improvement: new concrete retaining walls.Details
comply with nov #202297886, remove damaged retaining wall adjacent to rear property line in rear yard. rear yard improvement: new concrete retaining walls. | $7,500 | |
| Nov 30, 2022 | Never finaled issued Jan 2023, no final | 126 Grattan St | Gem Home Improvements Inc | partial interior remodel reconfiguring interior stair, close (e) lightwell installon ada elevator. ground level: excavation to increase garage height, new slab. first level demo bath add new powder room, kitchen remodel demo corl burning fireplace. second level new additional both and remodel of (e)Details
partial interior remodel reconfiguring interior stair, close (e) lightwell installon ada elevator. ground level: excavation to increase garage height, new slab. first level demo bath add new powder room, kitchen remodel demo corl burning fireplace. second level new additional both and remodel of (e) | $175,000 |
| Jul 13, 2022 | Completed final sign-off Jan 2025 | 479 37th Av | O'neill & Neville Construction Inc | exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom.Details
exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom. | $130,000 |
| Jun 30, 2022 | Completed final sign-off May 2025 | 780 Darien Wy | Globus Builder Inc | convert an existing detached garage to an adu unit with a living roof per the state adu program. the project also proposes adding two parking spaces in the existing driveway. to comply with pid complaint #202288002, bid nov #202287234, and planning enf case no. 2022-0674enf.Details
convert an existing detached garage to an adu unit with a living roof per the state adu program. the project also proposes adding two parking spaces in the existing driveway. to comply with pid complaint #202288002, bid nov #202287234, and planning enf case no. 2022-0674enf. | $15,000 |
| Mar 29, 2022 | Expired or cancelled expired May 2025 | 780 Darien Wy | Globus Builder Inc | partially comply w/complaint 202287234. revert to garage use. main house - french drain, water proofing. remove stairs, close door leading to side yard. (n) bathroom, walkin closet main bedrm. remodel (e) full bathrooms, 1/2 bath & kitchen. remove wall btwn kitchen & breakfast nook. family andDetails
partially comply w/complaint 202287234. revert to garage use. main house - french drain, water proofing. remove stairs, close door leading to side yard. (n) bathroom, walkin closet main bedrm. remodel (e) full bathrooms, 1/2 bath & kitchen. remove wall btwn kitchen & breakfast nook. family and | $65,000 |
| Feb 3, 2022 | Completed final sign-off Jul 2023 | 85 Farallones St | to comply with nov# 200846870 & 200685915. legalization of rear addition and rear spiral stair case.Details
to comply with nov# 200846870 & 200685915. legalization of rear addition and rear spiral stair case. | $20,000 | |
| Sep 30, 2021 | Completed final sign-off Aug 2024 | 1564 Green St | Golden State Marble & Granite Inc. | revision to pa 202106071779 modification to structural sheets.Details
revision to pa 202106071779 modification to structural sheets. | |
| Jun 7, 2021 | Completed final sign-off Aug 2024 | 1564 Green St | Golden State Marble & Granite Inc. | interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers.Details
interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers. | $150,000 |
| Apr 14, 2021 | Completed final sign-off Oct 2022 | 2535 Union St | to comply with nov 202174457. proposed alteration of front deck (above garage) and structural improvements landscape drawings.Details
to comply with nov 202174457. proposed alteration of front deck (above garage) and structural improvements landscape drawings. | $15,000 |