Stephen Sooter
- License
- C20334
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- May 2015 to Aug 2024
4 permits since 2000 (architect on 4 permits): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Peter Downey Construction Co., Inc. (2), Mason Construction Building Performance, Pederson Construction
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Apr 2025 | 2151 Laguna St | Peter Downey Construction Co., Inc. | #4 -remodel kitchen, 3 bathrooms, laundry room, and closets. new lighting, floor, hydronic heat and fixtures. no structural or window work. all work has been carried under #201910154451, but that permit is to be cancelled because of incorrect lot #17 & unit 3Details
#4 -remodel kitchen, 3 bathrooms, laundry room, and closets. new lighting, floor, hydronic heat and fixtures. no structural or window work. all work has been carried under #201910154451, but that permit is to be cancelled because of incorrect lot #17 & unit 3 | |
| Oct 15, 2019 | Expired or cancelled cancelled Oct 2024 | 2151 Laguna St | Peter Downey Construction Co., Inc. | #3- remodel kitchen, 3 baths. change steam radiators to infloor hydronic heat. relocate some non bearing partition walls, relocate selected doors. no window work, structural, or exterior. relocate laundry. (e) boiler for entire building shall remain.Details
#3- remodel kitchen, 3 baths. change steam radiators to infloor hydronic heat. relocate some non bearing partition walls, relocate selected doors. no window work, structural, or exterior. relocate laundry. (e) boiler for entire building shall remain. | $400,000 |
| Dec 18, 2015 | Completed final sign-off Nov 2016 | 3 Peralta Av | Pederson Construction | replace existing wood front entrance stair, remove prior garage addition, replace some concrete paved areas with plantingDetails
replace existing wood front entrance stair, remove prior garage addition, replace some concrete paved areas with planting | $18,000 |
| May 7, 2015 | Completed final sign-off Jul 2015 | 338 Spear St | Mason Construction Building Performance | unit 41 b: interior remodel of existing residential unit in a high rise condominium building. includes minor reconfig of walls and changes to lighting, plumbing fixt, finishes. no change to egress,exterior wallsDetails
unit 41 b: interior remodel of existing residential unit in a high rise condominium building. includes minor reconfig of walls and changes to lighting, plumbing fixt, finishes. no change to egress,exterior walls | $95,000 |