Shaun Moynahan
- License
- S5605
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5605 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Semco Engineering Inc
- On San Francisco permits
- Nov 2009 to Aug 2014
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Barker-O'donoghue Master Bldrs, Kelly Construction
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2014 | Completed final sign-off Oct 2017 | 1769 Beach St | Barker-O'donoghue Master Bldrs | merger of upper 2 units into one unit. add staircase from garage to level 2 and from level 3 to (n) roof deck.legalize (e) in-law unit through amnesty program. reconfigure interior partitions, add new plumbing fixtures, new interior finishes. n/a w/maher ordinance.Details
merger of upper 2 units into one unit. add staircase from garage to level 2 and from level 3 to (n) roof deck.legalize (e) in-law unit through amnesty program. reconfigure interior partitions, add new plumbing fixtures, new interior finishes. n/a w/maher ordinance. | $175,000 |
| Nov 23, 2009 | Completed final sign-off Feb 2010 | 105 Coleridge St | Kelly Construction | replace front foundation and shear wall. replace and repair one step and landing if required.Details
replace front foundation and shear wall. replace and repair one step and landing if required. | $22,000 |