Sean Bailey
- Listed as
- architect
- Firm
- Sean Bailey Design
- On San Francisco permits
- Dec 2016 to Mar 2025
7 permits since 2000 (architect on 7 permits): 5 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2025 | In progress filed Mar 2025, not yet issued | 496 Seacliff Av | demolition of existing 3-story, single family dwelling.Details
demolition of existing 3-story, single family dwelling. | $10,000 | |
| Mar 19, 2025 | In progress filed Mar 2025, not yet issued | 496 Seacliff Av | construction of a 3-story, type v-b over basement, single family residence which its 1st level roof becomes the foundation of an attached 1-story , type v-b accessory dwelling unit.Details
construction of a 3-story, type v-b over basement, single family residence which its 1st level roof becomes the foundation of an attached 1-story , type v-b accessory dwelling unit. | $5,000,000 | |
| Feb 6, 2025 | Completed final sign-off May 2025 | 765 Market St | 38 Degress North Latitude Builders Inc. | 40/fl (penthouse 3d): minor revision from original permit to switch toilet and bath and shower fixture locations. original pa#2024-1219-7167Details
40/fl (penthouse 3d): minor revision from original permit to switch toilet and bath and shower fixture locations. original pa#2024-1219-7167 | |
| Dec 19, 2024 | Completed final sign-off May 2025 | 765 Market St | 38 Degress North Latitude Builders Inc. | 40/f: remodel guest bedroom of penthouse and add new powder room. new finishes, plumbing fixtures and elec fixtures, sink and toilet.Details
40/f: remodel guest bedroom of penthouse and add new powder room. new finishes, plumbing fixtures and elec fixtures, sink and toilet. | $205,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2024 | 2100 Pacific Av | Forma Construction | unit 10: interior renovation. new interior layout, plumbing, mechanical, and electrical. no structural or exterior work except replacing windows in kind (eood hung cottage style with three over one true divided lites hung).Details
unit 10: interior renovation. new interior layout, plumbing, mechanical, and electrical. no structural or exterior work except replacing windows in kind (eood hung cottage style with three over one true divided lites hung). | $500,000 |
| Mar 13, 2017 | Completed final sign-off Sep 2017 | 765 Market St | 38 Degress North Latitude Builders Inc. | minor kitche remodel, demo one non structural wall and relocate fridge, refinish (e) hardwrrod and replace (e) kitche floor tiles. new casework doors in kitchen cabinetry, new island with new electric outlets, light fixtures and appliancesDetails
minor kitche remodel, demo one non structural wall and relocate fridge, refinish (e) hardwrrod and replace (e) kitche floor tiles. new casework doors in kitchen cabinetry, new island with new electric outlets, light fixtures and appliances | $100,000 |
| Dec 8, 2016 | Completed final sign-off Jun 2017 | 101 Lombard St | 38 Degress North Latitude Builders Inc. | unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixturesDetails
unit #706: kitchen, bathroom, living rm and bedroom remodel. new floor finishes , new casework, new bathr tubs and toilet in bathrooms. new light fixtures | $185,000 |