Scott Woods
- License
- E19794
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E19794 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2022 to Jan 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cccs, Inc, Profound Systems Inc.
- Architects
- Adam Siros, Anthony Siros
- Engineers
- Devon Furstenau, John Pollock
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 5, 2023 | Completed final sign-off Jul 2024 | 926 Taraval St | Profound Systems Inc. | abe#201812143000, upgrade portions of public sidewalk to provide compliant path of travel from the public row to the entrance, reconstructing landings at bottom of sloped walk and at entrance door including new threshold, automatic door openers & door hardware adjustments, remove barriersDetails
abe#201812143000, upgrade portions of public sidewalk to provide compliant path of travel from the public row to the entrance, reconstructing landings at bottom of sloped walk and at entrance door including new threshold, automatic door openers & door hardware adjustments, remove barriers | $134,000 |
| Nov 29, 2022 | Completed final sign-off May 2024 | 500 Van Ness Av | Cccs, Inc | chase bank: replacement of interior chair lift with platform lift.Details
chase bank: replacement of interior chair lift with platform lift. | $90,000 |