Scott Schneider
- License
- C34143
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- May 2022 to Jun 2022
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Aaron Gordon Construction Inc
- Engineers
- Paul O'neill
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2022 | Completed final sign-off Aug 2022 | 333 Beale St | unit #6e: add new steel framed gwb ceiling in living room, kitchen, 2 bedrooms, and foyer to accommodate new recessed lighting.Details
unit #6e: add new steel framed gwb ceiling in living room, kitchen, 2 bedrooms, and foyer to accommodate new recessed lighting. | $12,000 | |
| May 31, 2022 | Completed final sign-off Apr 2023 | 201 Folsom St | Aaron Gordon Construction Inc | revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetryDetails
revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetry |