Scott Fletcher
- License
- C90765
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C90765 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2025 to Dec 2025
2 permits since 2000 (engineer on 2 permits): 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Communication Technology Services Llc (2)
- Engineers
- Kevin Diaz
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2025 | In progress issued Dec 2025 | 730 Howard St | Communication Technology Services Llc | installation of new 100 amp sub panel with stepdown transformer at main das head 2nd room. moscone north and secondary location in moscone west. ref pa #202509185597Details
installation of new 100 amp sub panel with stepdown transformer at main das head 2nd room. moscone north and secondary location in moscone west. ref pa #202509185597 | $259,000 |
| Sep 18, 2025 | In progress issued Sep 2025 | 730 Howard St | Communication Technology Services Llc | cts to install ~ 25 linear feet of floor-mounted racks and cellular (das antenna systems) equipment in the head end of the electrical room on 2nd floor.Details
cts to install ~ 25 linear feet of floor-mounted racks and cellular (das antenna systems) equipment in the head end of the electrical room on 2nd floor. | $318,364 |