Ronald Anthony Perner
- Listed as
- architect
- Firm
- Ronald A. Perner Architect
- On San Francisco permits
- Nov 2009 to Feb 2019
10 permits since 2000 (architect on 10 permits): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 22, 2019 | Never finaled issued Mar 2019, no final | 860 Eddy St | W N G S Construction | remodel ada bathroom in room 201 & 204Details
remodel ada bathroom in room 201 & 204 | $8,000 |
| Sep 20, 2018 | Completed final sign-off Oct 2019 | 433 Ellis St | Swift Construction | demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entrance gate. maher n/a.Details
demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entrance gate. maher n/a. | $28,000 |
| Dec 28, 2016 | Expired or cancelled withdrawn Apr 2018 | 139 06th St | basement corridor with 2 multipurpose rooms, toilet rm & laundry, ground floor new servery room, change occupancy from r-2 to 42.1.Details
basement corridor with 2 multipurpose rooms, toilet rm & laundry, ground floor new servery room, change occupancy from r-2 to 42.1. | $75,000 | |
| Aug 30, 2012 | Completed final sign-off Aug 2013 | 1909 Bush St | Paks Builder Co | installation of elevator extension, elevated walk, change patio pattern to create new walkway, new accessible toilet room, add slope to sill of main entry, accessible signage this is ca title 8- article 15 "limited use limited access" elevatorDetails
installation of elevator extension, elevated walk, change patio pattern to create new walkway, new accessible toilet room, add slope to sill of main entry, accessible signage this is ca title 8- article 15 "limited use limited access" elevator | $120,000 |
| Jul 10, 2012 | Completed final sign-off Jun 2014 | 1355 Masonic Av | Scott & Warner Builders Inc | repair fire damage including gyp wall board, plumbing, electrical & heating, walls, insulation. legalize (e) game room, full bath, drak room & storage @ garage level.Details
repair fire damage including gyp wall board, plumbing, electrical & heating, walls, insulation. legalize (e) game room, full bath, drak room & storage @ garage level. | $520,000 |
| Jun 18, 2012 | Never finaled issued Apr 2013, no final | 481 Minna St | install the following: 1st floor accessiable toilet room, 3 new shower room, & 3 new toilet rooms. 2nd floor & 3rd fl new bathroom, 4 new shower rms, & 3 new toilet rooms. total 12 total (n) toilets, 1 accessiable shower 11 (n) regular showers & 3 new lavatories (sink) fire alarm n sprinklers sep.Details
install the following: 1st floor accessiable toilet room, 3 new shower room, & 3 new toilet rooms. 2nd floor & 3rd fl new bathroom, 4 new shower rms, & 3 new toilet rooms. total 12 total (n) toilets, 1 accessiable shower 11 (n) regular showers & 3 new lavatories (sink) fire alarm n sprinklers sep. | $71,000 | |
| Apr 4, 2012 | Completed final sign-off Jan 2018 | 139 06th St | revision to 201111219340. add new stair to replace existing from gr floor to basement.Details
revision to 201111219340. add new stair to replace existing from gr floor to basement. | $6,000 | |
| Nov 21, 2011 | Completed final sign-off Jan 2018 | 139 06th St | interior gr floor remodel. new partitions to create an exit corridor to front. new community room, and resident manager office. includes electrical, plumbing under sep permitDetails
interior gr floor remodel. new partitions to create an exit corridor to front. new community room, and resident manager office. includes electrical, plumbing under sep permit | $50,000 | |
| Nov 21, 2011 | Completed final sign-off Jan 2018 | 139 06th St | 3rd & 4th floor - total 4 new toilet rooms & 4 new showers on 3rd and 4th floors. includes lights & exhaust fans. 2 toilet rooms and 2 showers on each floor.Details
3rd & 4th floor - total 4 new toilet rooms & 4 new showers on 3rd and 4th floors. includes lights & exhaust fans. 2 toilet rooms and 2 showers on each floor. | $18,000 | |
| Nov 6, 2009 | Completed final sign-off Jul 2010 | 139 06th St | install garbage chute in (e) brick court yard @ 2nd, 3rd, 4th floor. required fire smoke detector and required sprinklers (2) on seperate permit.Details
install garbage chute in (e) brick court yard @ 2nd, 3rd, 4th floor. required fire smoke detector and required sprinklers (2) on seperate permit. | $9,500 |