Robert Mittelstadt
- Listed as
- architect, authorized agent-others
- Firm
- Robert Mittelstadt Architect
- On San Francisco permits
- Nov 2001 to May 2012
10 permits since 2000 (architect on 9 permits, authorized agent-others on 1 permit): 7 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2012 | Completed final sign-off Sep 2012 | 1333 Jones St | Bellcore Construction Inc | add wet bar, add office, bath, dinning room and pantry cabinets. add new electrical including moving panel. add new oen and regrigerator. no structual work. revison to pa#201201303134.Details
add wet bar, add office, bath, dinning room and pantry cabinets. add new electrical including moving panel. add new oen and regrigerator. no structual work. revison to pa#201201303134. | $20,000 |
| Aug 9, 2010 | Completed final sign-off Aug 2010 | 2452 Washington St | scope: to show as built construction of wet bar at 3rd floor; note: further remodeling of kitchen and bath associated with kitchen took place under pa# 200909227388Details
scope: to show as built construction of wet bar at 3rd floor; note: further remodeling of kitchen and bath associated with kitchen took place under pa# 200909227388 | ||
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 2452 Washington St | Bellcore Construction Inc | relocate bath, expand ktichen over 1st floor kitchen, add deck.Details
relocate bath, expand ktichen over 1st floor kitchen, add deck. | $200,000 |
| Jul 18, 2008 | Never finaled issued Nov 2008, no final | 146 Funston Av | Bellcore Construction Inc | revision to pa 200610023904s, plan modifications moved ext. doors on 1st & 2nd flrs & moved int. partition on 2nd flor; added toilet on 1st flr & deleted protected exit through garage. dwg rev. 2 & 3. see att request.Details
revision to pa 200610023904s, plan modifications moved ext. doors on 1st & 2nd flrs & moved int. partition on 2nd flor; added toilet on 1st flr & deleted protected exit through garage. dwg rev. 2 & 3. see att request. | |
| Oct 18, 2006 | Expired or cancelled withdrawn Mar 2009 | 2650 Hyde St | add basement garage,5 stop elevator,roof deck @4th floor (same). replace non-conforming interior & rear exterior stairs.reconfigure 1/f & 3/f bath,filling in lightwell on n. side,reduce rear projection on 1/f & 2/f.add deck on 3/f,add rear ext.stairway to (n)garage & metal fire escape betweenDetails
add basement garage,5 stop elevator,roof deck @4th floor (same). replace non-conforming interior & rear exterior stairs.reconfigure 1/f & 3/f bath,filling in lightwell on n. side,reduce rear projection on 1/f & 2/f.add deck on 3/f,add rear ext.stairway to (n)garage & metal fire escape between | $550,000 | |
| Oct 2, 2006 | Completed final sign-off Oct 2009 | 146 Funston Av | Bellcore Construction Inc | demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f,Details
demo & replace all ext. rear stairs, extend g/f 3' and fill in (e) 8'x12' space, extend 1/f 3' & fill in (e) deck space 8'x12', add new deck 8'x13', add new deck @ 2/f 8'x15' & construct new ext. stairs connecting all levels w/rearyard, internal; add new bath & b.r. @ g/f, move bath/kitchen on 1/f, | $350,000 |
| Dec 2, 2005 | Completed final sign-off Oct 2007 | 1919 Baker St | Bellcore Construction Inc | horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath.Details
horizontal addition: extend 1st floor dining room into sideyard, extend br, 5' south, extend family room 5' south & remodel kitchen & powder room, excavate rear of ll, create new bedrm & bath, add 2nd floor. deck. add int stair betwn ll and 1st floor @ rear & remodel 2nd floor bath. | $400,000 |
| Nov 15, 2005 | Completed final sign-off Apr 2006 | 375 Lexington St | replace cabinets, sink , refr add d.w., replacewindow & doors ot (e) deckDetails
replace cabinets, sink , refr add d.w., replacewindow & doors ot (e) deck | $10,000 | |
| Sep 27, 2005 | Expired or cancelled withdrawn Feb 2007 | 2650 Hyde St | interior remodel of 3 floors of occupancy to include master bed & bath at 3rd level.Details
interior remodel of 3 floors of occupancy to include master bed & bath at 3rd level. | $180,000 | |
| Nov 20, 2001 | Completed final sign-off Jan 2003 | 2646 Hyde St | construct deck, closet, half bath plus bedroom, & bar (wet), in (e) space on 3rd floor only.Details
construct deck, closet, half bath plus bedroom, & bar (wet), in (e) space on 3rd floor only. | $8,000 |