Robert Mahony
- Listed as
- engineer
- Firm
- Soil Engineering Construction
- Based in
- Redwood City
- On San Francisco permits
- Mar 2018 to Aug 2022
4 permits since 2000 (engineer on 4 permits): 2 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2022 | Expired or cancelled withdrawn Jul 2024 | 224 Seacliff Av | Soil Engineering Construction | to comply with nov# 202183822 & planning violation # 2022-001049enf. rockfall hazard mitigation, removal of all non structural elements observed beyond currently presumed property lines. mitigation of hazards presented by previously incorrectly scoped construction permits.Details
to comply with nov# 202183822 & planning violation # 2022-001049enf. rockfall hazard mitigation, removal of all non structural elements observed beyond currently presumed property lines. mitigation of hazards presented by previously incorrectly scoped construction permits. | $150,000 |
| Mar 10, 2022 | Completed final sign-off Sep 2022 | 150 Hampshire St | Soil Engineering Construction | to comply with nov 202183614, replace existing system and remove debris.Details
to comply with nov 202183614, replace existing system and remove debris. | $45,000 |
| May 26, 2020 | Completed final sign-off Mar 2021 | 1 San Antonio Pl | Soil Engineering Construction | a rock fall slope netting system with rock anchors installed along the top, middle and bottom edges with 3mm composite cabled wire mesh. to comply with nov2020022932Details
a rock fall slope netting system with rock anchors installed along the top, middle and bottom edges with 3mm composite cabled wire mesh. to comply with nov2020022932 | $100,000 |
| Mar 28, 2018 | Never finaled issued Jul 2018, no final | 130 Roosevelt Wy | Soil Engineering Construction | new soldier pile retaining wallDetails
new soldier pile retaining wall | $75,000 |