Robert Kennedy
- Listed as
- contractor, designer
- Firm
- Robert Kennedy Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2017 to Sep 2026
17 permits since 2000 (contractor on 17 permits, designer on 3 permits): 10 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 2900 Clay St | Robert Kennedy Construction | replacing sections of retaining wall.Details
replacing sections of retaining wall. | $12,000 |
| Jun 10, 2026 | In progress issued Jul 2026 | 1439 22nd Av | Robert Kennedy Construction | residential alteration and renovation including reconfigured garage, (2) new bedrooms and (1) full bathroom, laundry room, new reconfiguraed interior stairs, kitchen finishes and appliances to be replaced in kind. new exterior windows and doors at rear elevation.Details
residential alteration and renovation including reconfigured garage, (2) new bedrooms and (1) full bathroom, laundry room, new reconfiguraed interior stairs, kitchen finishes and appliances to be replaced in kind. new exterior windows and doors at rear elevation. | $185,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 1439 22nd Av | Robert Kennedy Construction | replacement in kind of kitchen cabinets, backsplash tile countertops and flooring tile.Details
replacement in kind of kitchen cabinets, backsplash tile countertops and flooring tile. | $36,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 2900 Clay St | Robert Kennedy Construction | replacing in kind (e) basement finish materials and plumbing fixtures. reconfiguring (e) laundry room and plumbing fixture locations. modifying (e) elevator shaft walls and ceiling assemblies to provide new 1 hr fire rated assemblies. replacing in kind (e) elevator hoistway doors with new 45 minDetails
replacing in kind (e) basement finish materials and plumbing fixtures. reconfiguring (e) laundry room and plumbing fixture locations. modifying (e) elevator shaft walls and ceiling assemblies to provide new 1 hr fire rated assemblies. replacing in kind (e) elevator hoistway doors with new 45 min | $12,000 |
| Jan 8, 2026 | Completed final sign-off Aug 2026 | 478 Hoffman Av | Robert Kennedy Construction | replace/repair detoriorated front siding, replacing in kind front windows and entry door, replacing in kind front stairs and porch, waterproofing.Details
replace/repair detoriorated front siding, replacing in kind front windows and entry door, replacing in kind front stairs and porch, waterproofing. | $22,000 |
| Dec 20, 2024 | In progress issued Apr 2025 | 2900 Clay St | Robert Kennedy Construction | rev 202406144553: (e) structural repair in-kind. replacing of (e) trellis structural & existing glazing wind scr inkind. dmged strc post beams inkind. rplc (e) french doors & transom windows w/(n) folding glass door @ rear (west elevations); interior & prim. bathrm remodel. rplc plmg fixuresDetails
rev 202406144553: (e) structural repair in-kind. replacing of (e) trellis structural & existing glazing wind scr inkind. dmged strc post beams inkind. rplc (e) french doors & transom windows w/(n) folding glass door @ rear (west elevations); interior & prim. bathrm remodel. rplc plmg fixures | $36,000 |
| Jun 14, 2024 | In progress issued Jul 2024 | 2900 Clay St | Robert Kennedy Construction | siding repair/window replacement.wood to match existing. fluid applied weather resistive barrier and 10m drainmat at wall areas.paint wood cornice.replace fire escape west elevation. terrace deck waterproofing, pedestal pavers,guardrails 2nd fl terrace,replace building projection roofing. all deckDetails
siding repair/window replacement.wood to match existing. fluid applied weather resistive barrier and 10m drainmat at wall areas.paint wood cornice.replace fire escape west elevation. terrace deck waterproofing, pedestal pavers,guardrails 2nd fl terrace,replace building projection roofing. all deck | $26,000 |
| Oct 12, 2023 | In progress issued Oct 2023 | 1495 Masonic Av | Robert Kennedy Construction | unit a: interior renovation of main and guest baths, including new fixtures and finishes. no structural work. no changes to interior partitions. no exterior changes.Details
unit a: interior renovation of main and guest baths, including new fixtures and finishes. no structural work. no changes to interior partitions. no exterior changes. | $50,000 |
| Sep 22, 2023 | Completed final sign-off May 2024 | 1320 Kearny St | Robert Kennedy Construction | rear yard deck repair. new waterproofing, new finishes. no changes to deck configuration less than 50% repair.Details
rear yard deck repair. new waterproofing, new finishes. no changes to deck configuration less than 50% repair. | $10,000 |
| Jun 22, 2023 | Completed final sign-off Apr 2024 | 478 Hoffman Av | Robert Kennedy Construction | new dormer and roof extension at 3rd level bedroom, scope of work includes new rated property line wall and parapetm new skylight, new rear facing window, no increase in gsf, new electrical, lighting and finishes in bedroom.Details
new dormer and roof extension at 3rd level bedroom, scope of work includes new rated property line wall and parapetm new skylight, new rear facing window, no increase in gsf, new electrical, lighting and finishes in bedroom. | $50,000 |
| Jan 28, 2021 | Completed final sign-off Jun 2021 | 225 Dolores St | Robert Kennedy Construction | voluntary replacement of existing retaining wall at property line. voluntary upgrade of existing shear wall at garage.Details
voluntary replacement of existing retaining wall at property line. voluntary upgrade of existing shear wall at garage. | $20,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2020 | 112 Corwin St | Robert Kennedy Construction | rev to pa# 201908148812; remove and replace in-kind deck tile, guardrails, access ladders, replace rotten siding in-kind on rear facade & parapeh walls, replace in-kind angeld windows & patio, sliding doorDetails
rev to pa# 201908148812; remove and replace in-kind deck tile, guardrails, access ladders, replace rotten siding in-kind on rear facade & parapeh walls, replace in-kind angeld windows & patio, sliding door | $80,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2020 | 112 Corwin St | Robert Kennedy Construction | replace tile in-kind on (e) decks (2), new flashing at parapet walls where it meets deck, no work to (e) deck framing, decks are rear of house only impcts unit 112 corwin st.Details
replace tile in-kind on (e) decks (2), new flashing at parapet walls where it meets deck, no work to (e) deck framing, decks are rear of house only impcts unit 112 corwin st. | $12,000 |
| Feb 19, 2019 | Completed final sign-off May 2020 | 114 Corwin St | Robert Kennedy Construction | field revisions to pa 2018-0919-0776 and 2018-1116-6111 for (e) construction conditionsDetails
field revisions to pa 2018-0919-0776 and 2018-1116-6111 for (e) construction conditions | $5,000 |
| Nov 16, 2018 | Completed final sign-off May 2020 | 114 Corwin St | Robert Kennedy Construction | rev to pa# 201809190776; for (e) framing different than expected, framing revised, shear walls revisedDetails
rev to pa# 201809190776; for (e) framing different than expected, framing revised, shear walls revised | $2,500 |
| Sep 19, 2018 | Completed final sign-off May 2020 | 114 Corwin St | Robert Kennedy Construction | replace kitchen cabinets, replace in-kind plumbing fixtures in master and guest bathroom, replace rear yard patio slider, remove non bearing walls around kitchen. replace interior stair handrails & treadDetails
replace kitchen cabinets, replace in-kind plumbing fixtures in master and guest bathroom, replace rear yard patio slider, remove non bearing walls around kitchen. replace interior stair handrails & tread | $68,000 |
| Jan 23, 2017 | Completed final sign-off Feb 2017 | 561 Valencia St | Robert Kennedy Construction | remove portion of (e) exterior shop front in order to remove industrial oven, (e) tile bulkhead and storefront window will be salvaged and storefront will be repaired to match existing. no other work under this permit.Details
remove portion of (e) exterior shop front in order to remove industrial oven, (e) tile bulkhead and storefront window will be salvaged and storefront will be repaired to match existing. no other work under this permit. | $1,500 |