Permit GraphShortlistSan Francisco building permits since 2000

Robert J Lara

License
30334
State contractor license record
Listed as
engineer
On San Francisco permits
Sep 2020 to Sep 2020

1 permit since 2000 (engineer on 1 permit): 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 18, 2020Completed
final sign-off Oct 2021
20 Heron StTot'l Environm'l /Pwer Sym Inc Dba:Tepsverizon: remove (e) 30kw diesel generator and replace with (n) 80kw diesel generator with (n) 52 gallon replacement tank; relocate (2) (e) condenser units; install (1) (n) condenser unit; no change to (e) antennas or (e) batteries.
Details
Permit
202009184472
Status
complete
Filed
Sep 18, 2020
Permit issued
Feb 27, 2021
Final sign-off
Oct 26, 2021
Declared cost
$55,000
Address
20 Heron St

verizon: remove (e) 30kw diesel generator and replace with (n) 80kw diesel generator with (n) 52 gallon replacement tank; relocate (2) (e) condenser units; install (1) (n) condenser unit; no change to (e) antennas or (e) batteries.

Open the permit page

$55,000