Robert Hale Randall
- License
- S4892
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S4892 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Saiful Bouquet S.E.
- On San Francisco permits
- Apr 2015 to Aug 2015
6 permits since 2000 (engineer on 6 permits): 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Saunders Construction Inc (6)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 6
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 530 Brannan St | Saunders Construction Inc | permit revision to 201504093253, clarified detal 2/s3.0 and added 3/s3.0 to account for as-built orientation of existing angle support; maher n/aDetails
permit revision to 201504093253, clarified detal 2/s3.0 and added 3/s3.0 to account for as-built orientation of existing angle support; maher n/a | |
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 548 Brannan St | Saunders Construction Inc | permit revision to 201504093254; clarified detal 2/s3.0 and added 3/s3.0 to account for as-built orientation of existing angle support.Details
permit revision to 201504093254; clarified detal 2/s3.0 and added 3/s3.0 to account for as-built orientation of existing angle support. | |
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 542 Brannan St | Saunders Construction Inc | permit revision to 201504093255; clarified detail 2/s3.0 and added 3/s3.0 to account for as built orientation of existing angle support; maher naDetails
permit revision to 201504093255; clarified detail 2/s3.0 and added 3/s3.0 to account for as built orientation of existing angle support; maher na | |
| Apr 9, 2015 | Never finaled issued Jun 2015, no final | 542 Brannan St | Saunders Construction Inc | common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations.Details
common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations. | $83,000 |
| Apr 9, 2015 | Never finaled issued Jun 2015, no final | 530 Brannan St | Saunders Construction Inc | common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations.Details
common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations. | $83,000 |
| Apr 9, 2015 | Never finaled issued Jun 2015, no final | 548 Brannan St | Saunders Construction Inc | common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations.Details
common area- voluntary partial seismic strengthening. n/a ordinance #155-13. one column thru two floors to be reinforced. 3rd floor mezz and 4th floor mezz: tie cmu shear wall to diaphragm at various locations. | $83,000 |