Richard Carlile
- License
- C9286
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C9286 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Arktegraf Inc.
- On San Francisco permits
- Nov 2013 to Sep 2015
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kdc Construction, T C B Builders Inc, Wells Construction Inc
- Engineers
- Douglas Snow, Richard Trufunovic
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2015 | Completed final sign-off Feb 2016 | 420 Mission Bay Blvd North Bl | T C B Builders Inc | (n) patio railing. n/a ordinance #155-13Details
(n) patio railing. n/a ordinance #155-13 | $100 |
| Jun 4, 2014 | Completed final sign-off Jul 2014 | 685 Beach St | Kdc Construction | amendment to 201404244104. response to inspectors corection notice of 5/21/14. work new mineral wool w/ in framing of 2 raised platforms. new ada complying handrail at ramp. new railing at window along beach st. ada sign at primary door. clarification of a occupancy. new ada waiting area.Details
amendment to 201404244104. response to inspectors corection notice of 5/21/14. work new mineral wool w/ in framing of 2 raised platforms. new ada complying handrail at ramp. new railing at window along beach st. ada sign at primary door. clarification of a occupancy. new ada waiting area. | $7,500 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 565 Clay St | Wells Construction Inc | alteration of existing interior. replace finsihes, cabinetry, lighting, equipment. exterior paint. any replacement shall not exceed current allowed service providedDetails
alteration of existing interior. replace finsihes, cabinetry, lighting, equipment. exterior paint. any replacement shall not exceed current allowed service provided | $350,000 |