Richard Bertolina
- Listed as
- architect, designer
- Based in
- Sausalito
- On San Francisco permits
- Nov 2010 to Apr 2018
10 permits since 2000 (architect on 9 permits, designer on 1 permit): 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2018 | Expired or cancelled cancelled Nov 2022 | 866 36th Av | Handyman Heroes Inc. | demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yardDetails
demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yard | $50,000 |
| Aug 15, 2016 | Completed final sign-off Dec 2016 | 866 36th Av | Handyman Heroes Inc. | remodel walk in closet to include new bathroom.Details
remodel walk in closet to include new bathroom. | $30,000 |
| Mar 23, 2016 | Completed final sign-off Nov 2016 | 1576 Waller St | Solstice Enterprises Inc. | convert closet to bathroom. add 2 solatube skylights.Details
convert closet to bathroom. add 2 solatube skylights. | $18,000 |
| May 4, 2015 | Completed final sign-off Sep 2015 | 1988 Greenwich St | Solstice Enterprises Inc. | convert (e) storage room to a new accessory home office space and adding 3'-0" x 7'-0" half bath for unit 1988 greenwich. all work to be done within (e) bldg. no work to 2nd & 3rd floors.Details
convert (e) storage room to a new accessory home office space and adding 3'-0" x 7'-0" half bath for unit 1988 greenwich. all work to be done within (e) bldg. no work to 2nd & 3rd floors. | $10,000 |
| Feb 24, 2014 | Completed final sign-off Nov 2014 | 230 10th Av | Solstice Enterprises Inc. | replace (e) rotted stairs with new stairs.Details
replace (e) rotted stairs with new stairs. | $11,000 |
| Feb 19, 2014 | Completed final sign-off May 2014 | 1127 Shrader St | Solstice Enterprises Inc. | convert closet to bathroom, all work within existing interior.Details
convert closet to bathroom, all work within existing interior. | $12,000 |
| Jul 29, 2013 | Completed final sign-off Aug 2013 | 970 Junipero Serra Bl | Solstice Enterprises Inc. | bathroom remodel at existing master bathroom.Details
bathroom remodel at existing master bathroom. | $9,500 |
| Jul 25, 2012 | Completed final sign-off Dec 2012 | 334 Richland Av | Solstice Enterprises Inc. | proposed convension of closet into an one-half bath at basement level.Details
proposed convension of closet into an one-half bath at basement level. | $7,000 |
| Aug 11, 2011 | Completed final sign-off Dec 2012 | 334 Richland Av | Solstice Enterprises Inc. | proposed infill room, new deck & roof top deck.Details
proposed infill room, new deck & roof top deck. | $31,000 |
| Nov 2, 2010 | Completed final sign-off Dec 2010 | 666 36th Av | Solstice Enterprises Inc. | convert toilet room and closet into full bathroom. convert (e) hakf bath into full bath by adding toilet within footprint. work on the 2nd floorDetails
convert toilet room and closet into full bathroom. convert (e) hakf bath into full bath by adding toilet within footprint. work on the 2nd floor | $18,800 |