- On San Francisco permits
- Sep 2021 to Jan 2026
8 permits since 2000 (contractor on 8 permits, designer on 1 permit): 4 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2026 | In progress filed Jan 2026, not yet issued | 566 Madrid St | R Medina Construction Inc | to comply w/n.o.v. legalize 2-story sfd w/ basement to 2 unit multi-family w/ basement to correct nov #201806511. legalize 1,668 sqft unauthorized unit per planning code 207(c)(8) aka fourplex legislation. planning approval record #2024-007458prj.Details
to comply w/n.o.v. legalize 2-story sfd w/ basement to 2 unit multi-family w/ basement to correct nov #201806511. legalize 1,668 sqft unauthorized unit per planning code 207(c)(8) aka fourplex legislation. planning approval record #2024-007458prj. | $100,000 |
| Jun 13, 2025 | Completed final sign-off Oct 2025 | 1875 09th Av | R Medina Construction Inc | like for like remodel of 1 bath and 1 kitchen. update kitchen subpanel existing 60a.Details
like for like remodel of 1 bath and 1 kitchen. update kitchen subpanel existing 60a. | $70,000 |
| Aug 7, 2024 | Expired or cancelled withdrawn Aug 2024 | 1520 Leavenworth St | R Medina Construction Inc | reinstall (e) floor joist for ramp inside hallway to comply with violation# 202426427.Details
reinstall (e) floor joist for ramp inside hallway to comply with violation# 202426427. | $2,000 |
| Oct 18, 2023 | Expired or cancelled withdrawn May 2024 | 566 Madrid St | R Medina Construction Inc | reverting deck to the last legas use to correct nov# 201806511. convert two story, single family dwelling with basement to 3 units, two story multi family dwelling with basement. legalize (e) habitable space.Details
reverting deck to the last legas use to correct nov# 201806511. convert two story, single family dwelling with basement to 3 units, two story multi family dwelling with basement. legalize (e) habitable space. | $150,000 |
| Aug 7, 2023 | Completed final sign-off Oct 2023 | 625 Belvedere St | R Medina Construction Inc | replace 1000 sf of back siding. existing siding is going to be removed and replaced with hardie board siding.Details
replace 1000 sf of back siding. existing siding is going to be removed and replaced with hardie board siding. | $6,000 |
| Jan 27, 2023 | Completed final sign-off Aug 2025 | 625 Belvedere St | R Medina Construction Inc | 2 bedroom remodel. rewire 8 outlets in 2 bedrooms and hallway in 3rd floor. add (3) new recessed lights. all breakers will remain the same. the panel will remain the same. like for like water heater replacement.Details
2 bedroom remodel. rewire 8 outlets in 2 bedrooms and hallway in 3rd floor. add (3) new recessed lights. all breakers will remain the same. the panel will remain the same. like for like water heater replacement. | $10,000 |
| Jul 20, 2022 | Expired or cancelled cancelled Jan 2026 | 2034 Mission St | R Medina Construction Inc | administrative permit to establish the limited restaurant to restaurant land use change. no work perform. remaining b occupancy.Details
administrative permit to establish the limited restaurant to restaurant land use change. no work perform. remaining b occupancy. | $3,000 |
| Sep 15, 2021 | Completed final sign-off Mar 2022 | 1327 09th Av | R Medina Construction Inc | change of occupancy for building from group b (acupuncture) ro group m (cheese retail)Details
change of occupancy for building from group b (acupuncture) ro group m (cheese retail) | $1,000 |