Rene Stolp
- Listed as
- contractor, designer
- Firm
- Ripplewood Holding
- Based in
- San Rafael
- On San Francisco permits
- Dec 2022 to May 2025
7 permits since 2000 (contractor on 7 permits, designer on 1 permit): 6 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off Aug 2026 | 2106 Leavenworth St | Ripplewood Holding | the project is an interior remodel. (n) sliding patio door to (e) deck. change rear windows in kind.Details
the project is an interior remodel. (n) sliding patio door to (e) deck. change rear windows in kind. | $12,000 |
| Apr 17, 2024 | Completed final sign-off Apr 2024 | 2470 23rd Av | Ripplewood Holding | to obtain final inspection for work approved under 201411040687. all work is completeDetails
to obtain final inspection for work approved under 201411040687. all work is complete | |
| Sep 29, 2023 | In progress issued Oct 2023 | 1111 Hampshire St | Ripplewood Holding | revision to pa# 202301170238. slightly altered orientation of interior stairs due to read/clearance and foundation protrusion.Details
revision to pa# 202301170238. slightly altered orientation of interior stairs due to read/clearance and foundation protrusion. | $15,000 |
| Apr 11, 2023 | Completed final sign-off May 2024 | 2470 23rd Av | Ripplewood Holding | revision to bpa#202212017481, move interior staircase in building envelope, extra support for (e) foundation @ rear of building. no change to exterior building envelope.Details
revision to bpa#202212017481, move interior staircase in building envelope, extra support for (e) foundation @ rear of building. no change to exterior building envelope. | $4,000 |
| Mar 3, 2023 | Completed final sign-off May 2024 | 2470 23rd Av | Ripplewood Holding | remove 85% of stucco at front of building due to akc of moisture barrier and subsequent dry rot. extensive repair of stud walls (exterior) needed. building appearnace to be preserved to original layout and/of altered to already approved and permitted state.Details
remove 85% of stucco at front of building due to akc of moisture barrier and subsequent dry rot. extensive repair of stud walls (exterior) needed. building appearnace to be preserved to original layout and/of altered to already approved and permitted state. | $15,000 |
| Jan 17, 2023 | Completed final sign-off May 2024 | 1111 Hampshire St | Ripplewood Holding | 1/flr: add 2 bedroom, 1 media room & 2 baths, remodel 2nd flr, add fenestrations and skylights.Details
1/flr: add 2 bedroom, 1 media room & 2 baths, remodel 2nd flr, add fenestrations and skylights. | $200,000 |
| Dec 1, 2022 | Completed final sign-off May 2024 | 2470 23rd Av | Dliu Construction, Ripplewood Holding | 1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fireDetails
1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fire | $225,000 |