Robert Beaufort Bernhard
- Listed as
- contractor, designer
- Firm
- Robert Bernhard Coatings/Rbc Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to May 2026
61 permits since 2000 (contractor on 61 permits, designer on 1 permit): 52 completed, 2 in progress, 2 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Jun 2026 | 2929 Gough St | Robert Bernhard Coatings/Rbc Inc | dryrot repairs, hardy plank trim and siding installation left side of home, approx 1500 sq ft. non street facing.Details
dryrot repairs, hardy plank trim and siding installation left side of home, approx 1500 sq ft. non street facing. | $20,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | +amendment to 202603278437 show joist attachement to slab. show location of pony walls and detail construction, show reconfigure laundry area.Details
+amendment to 202603278437 show joist attachement to slab. show location of pony walls and detail construction, show reconfigure laundry area. | $5,000 |
| Mar 27, 2026 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | level garage floor surface which currently has 6'' variation level. all work is interior.Details
level garage floor surface which currently has 6'' variation level. all work is interior. | $8,500 |
| Jan 29, 2026 | Completed final sign-off Aug 2026 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | construct short curb walls at replanting areas and short path and step to gate at the side yard. reference 2025-0319-2569.Details
construct short curb walls at replanting areas and short path and step to gate at the side yard. reference 2025-0319-2569. | $15,000 |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 144 Lake St | Robert Bernhard Coatings/Rbc Inc | replaced damaged fascia board and gutter front of bldg, street visible. repair dry rot front and rear of bldg.Details
replaced damaged fascia board and gutter front of bldg, street visible. repair dry rot front and rear of bldg. | $10,000 |
| Oct 20, 2025 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | revision 202507100511 inspector requested detail for construction of enlarged passageway to kitchenDetails
revision 202507100511 inspector requested detail for construction of enlarged passageway to kitchen | $3,000 |
| Sep 2, 2025 | Completed final sign-off Nov 2025 | 868 Foerster St | Robert Bernhard Coatings/Rbc Inc | replacement of siding back of the building. replace 4 windows in the back of the house; like for like; u=0.3max.Details
replacement of siding back of the building. replace 4 windows in the back of the house; like for like; u=0.3max. | $40,000 |
| Jul 10, 2025 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | kitchen renovation, in kind.Details
kitchen renovation, in kind. | $80,000 |
| Jul 3, 2025 | Completed final sign-off Sep 2025 | 3314 Folsom St | Robert Bernhard Coatings/Rbc Inc | remodeling and replace multiple areas of dry rot, siding and trim. street visible (front).Details
remodeling and replace multiple areas of dry rot, siding and trim. street visible (front). | $30,000 |
| Jul 3, 2025 | Completed final sign-off Sep 2025 | 138 Peralta Av | Robert Bernhard Coatings/Rbc Inc | replace existing front stairs and handrail, same configuration, no archterual changes.Details
replace existing front stairs and handrail, same configuration, no archterual changes. | $20,000 |
| Jul 3, 2025 | Completed final sign-off Jul 2025 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | permit required for garage door. it was done by previous contractor.Details
permit required for garage door. it was done by previous contractor. | $500 |
| Mar 19, 2025 | Completed final sign-off Apr 2026 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | install gate entrance to the backyard from 11th ave visible from street.Details
install gate entrance to the backyard from 11th ave visible from street. | $3,000 |
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 1040 Lombard St | Robert Bernhard Coatings/Rbc Inc | remove and replace dry rotted beams on pergola front balcony in kind.Details
remove and replace dry rotted beams on pergola front balcony in kind. | $10,000 |
| Jan 30, 2025 | Completed final sign-off Apr 2025 | 677 05th Av | Robert Bernhard Coatings/Rbc Inc | replace (e) non conforming rear stair in kind. replace dry rotted rear laundry porch support post. reference sfbc 1011.12.3Details
replace (e) non conforming rear stair in kind. replace dry rotted rear laundry porch support post. reference sfbc 1011.12.3 | $20,000 |
| Jan 9, 2025 | Completed final sign-off Jul 2025 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | remove and replace vinyl siding 3 sides of building hardie plank horizontal siding.Details
remove and replace vinyl siding 3 sides of building hardie plank horizontal siding. | $15,000 |
| Jan 7, 2025 | Completed final sign-off Jul 2025 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | revision permit#202410092645 floor plan modification level 1 & 2. construcct foyer separating the garage from the sleeping area. replace 10 windows facing the street to be fiber glass, others to be vinyl. windows to be replaced in kind no new framing.Details
revision permit#202410092645 floor plan modification level 1 & 2. construcct foyer separating the garage from the sleeping area. replace 10 windows facing the street to be fiber glass, others to be vinyl. windows to be replaced in kind no new framing. | |
| Dec 27, 2024 | Expired or cancelled withdrawn Jul 2025 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | revision to pa #2024-1009-2645 wall on the original drawing will not be installedDetails
revision to pa #2024-1009-2645 wall on the original drawing will not be installed | |
| Oct 23, 2024 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | strip down 2 bathrooms replace all fixtures and floorings prime and paint -in kindDetails
strip down 2 bathrooms replace all fixtures and floorings prime and paint -in kind | $40,000 |
| Oct 9, 2024 | Completed final sign-off Jul 2025 | 350 Noriega St | Robert Bernhard Coatings/Rbc Inc | remodel (e) kitchen and bathrooom on upper level. convert unfinished space in lower level to habitable space. included: bathroom, laundry area, and bedroom. replace street facing windows with fiber glass windows. new windows at south elevationDetails
remodel (e) kitchen and bathrooom on upper level. convert unfinished space in lower level to habitable space. included: bathroom, laundry area, and bedroom. replace street facing windows with fiber glass windows. new windows at south elevation | $80,000 |
| Jul 22, 2024 | Expired or cancelled expired Jan 2026 | 2898 Vallejo St | Robert Bernhard Coatings/Rbc Inc | re-roofingDetails
re-roofing | $20,000 |
| Jun 5, 2024 | Completed final sign-off Aug 2024 | 1180 Broderick St | Robert Bernhard Coatings/Rbc Inc | rev 202403117505 and ref 202404190322-dry rot repair to partial foundation and 3rd floor deck repair due to dry rot located at the rear side of buildingDetails
rev 202403117505 and ref 202404190322-dry rot repair to partial foundation and 3rd floor deck repair due to dry rot located at the rear side of building | $30,000 |
| Apr 19, 2024 | Completed final sign-off Aug 2024 | 1180 Broderick St | Robert Bernhard Coatings/Rbc Inc | rev to pa# 2024-0311-7505 to expand additional area of repair per inspector's instructions; dry rot repair back of building east elevation install approximately 2,000 sq ft of hardie plank cap siding. to expand additional area of repair per inspectors instructionsDetails
rev to pa# 2024-0311-7505 to expand additional area of repair per inspector's instructions; dry rot repair back of building east elevation install approximately 2,000 sq ft of hardie plank cap siding. to expand additional area of repair per inspectors instructions | $15,000 |
| Mar 28, 2024 | In progress issued Mar 2024 | 17 Coleridge St | Robert Bernhard Coatings/Rbc Inc | revision to permit#: 2024.0222.6378 remove andreplace approx. 380 sqft in siding., in kindDetails
revision to permit#: 2024.0222.6378 remove andreplace approx. 380 sqft in siding., in kind | $20,000 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 2360 Fillmore St | Robert Bernhard Coatings/Rbc Inc | stabilize top portion of sign that was damaged due to fallen tree limb. repair sign. to comply w/ nov 2024.18893Details
stabilize top portion of sign that was damaged due to fallen tree limb. repair sign. to comply w/ nov 2024.18893 | $1,000 |
| Mar 11, 2024 | Completed final sign-off Aug 2024 | 1180 Broderick St | Robert Bernhard Coatings/Rbc Inc | dryrot repair at 3 bays of building. misc. dryrot repair at trim around windows. remove and replace (80) vinyl windows in kind. painting exterior of building.Details
dryrot repair at 3 bays of building. misc. dryrot repair at trim around windows. remove and replace (80) vinyl windows in kind. painting exterior of building. | $90,000 |
| Feb 22, 2024 | In progress issued Feb 2024 | 17 Coleridge St | Robert Bernhard Coatings/Rbc Inc | dry rot repair and foundation capping w/ new sillDetails
dry rot repair and foundation capping w/ new sill | $5,000 |
| Feb 6, 2024 | Completed final sign-off Jun 2024 | 17 Coleridge St | Robert Bernhard Coatings/Rbc Inc | painting side and back south and east. remove and replace dry rot trim back door. remove/replace extg approx. 50 sqft of red wood siding in kind, replace 2 extg exterior doors. install approximately 200 sqft of sheet rock in downstairs office. not visible from street.Details
painting side and back south and east. remove and replace dry rot trim back door. remove/replace extg approx. 50 sqft of red wood siding in kind, replace 2 extg exterior doors. install approximately 200 sqft of sheet rock in downstairs office. not visible from street. | $25,000 |
| Dec 18, 2023 | Completed final sign-off Feb 2024 | 297 Page St | Robert Bernhard Coatings/Rbc Inc | replace siding in kind on south (approx. 300 sq. ft) and east side (approx. 200 sq. ft.). replace 20 windows in kind. replace 2 water tables. revision to permit 202310118428.Details
replace siding in kind on south (approx. 300 sq. ft) and east side (approx. 200 sq. ft.). replace 20 windows in kind. replace 2 water tables. revision to permit 202310118428. | $40,000 |
| Nov 1, 2023 | Completed final sign-off Nov 2023 | 118 Douglass St | Robert Bernhard Coatings/Rbc Inc | to obtain final inspection for work approved udner pa#: 202011098521 and 202011199298. all work is complete.Details
to obtain final inspection for work approved udner pa#: 202011098521 and 202011199298. all work is complete. | |
| Oct 11, 2023 | Completed final sign-off Feb 2024 | 297 Page St | Robert Bernhard Coatings/Rbc Inc | replace 2 windows in kind u=.30 max (1 side & 1 rear). paint exterior of bldg (all sides). double hung window. wood material.Details
replace 2 windows in kind u=.30 max (1 side & 1 rear). paint exterior of bldg (all sides). double hung window. wood material. | $20,000 |
| Jun 27, 2023 | Completed final sign-off Jul 2024 | 445 Marina Bl | Robert Bernhard Coatings/Rbc Inc | dry rot repair: front garage fort area and back porch of building.Details
dry rot repair: front garage fort area and back porch of building. | $10,000 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 25 Justin Dr | Robert Bernhard Coatings/Rbc Inc | garage level: build office room and bath. add one new window and one replacement.Details
garage level: build office room and bath. add one new window and one replacement. | $45,000 |
| Dec 23, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | Robert Bernhard Coatings/Rbc Inc | kitchen & bathroom remodel: replace plumbing, fixtures and appliances with no change to originall location. new cabinets and counters, new flooring in kitchen,bathroom and master bedroomDetails
kitchen & bathroom remodel: replace plumbing, fixtures and appliances with no change to originall location. new cabinets and counters, new flooring in kitchen,bathroom and master bedroom | $60,000 |
| Dec 14, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | Robert Bernhard Coatings/Rbc Inc | reference pa #2022-1021-4895 to include capping of top 24" of existing wall due to fire.Details
reference pa #2022-1021-4895 to include capping of top 24" of existing wall due to fire. | $10,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | Robert Bernhard Coatings/Rbc Inc | repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306Details
repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306 | $300,000 |
| Jul 29, 2022 | Never finaled issued Aug 2022, no final | 309 Lyon St | Robert Bernhard Coatings/Rbc Inc | remodel kitchen, cabinets, appliances & lighting.Details
remodel kitchen, cabinets, appliances & lighting. | $80,000 |
| Jul 7, 2022 | Completed final sign-off Jul 2023 | 3135 Mission St | Robert Bernhard Coatings/Rbc Inc | new partial foundation at rearDetails
new partial foundation at rear | $8,000 |
| Jun 17, 2022 | Completed final sign-off Jun 2023 | 3135 Mission St | Robert Bernhard Coatings/Rbc Inc | 1. remove old ti-11 siding, replace in-kind 800 sqft back of building. 2. remove old siding (redwood) replace w/ hardie plank approx 1200 sqft. comply with complaint #201071774 item #4Details
1. remove old ti-11 siding, replace in-kind 800 sqft back of building. 2. remove old siding (redwood) replace w/ hardie plank approx 1200 sqft. comply with complaint #201071774 item #4 | $50,000 |
| May 3, 2022 | Completed final sign-off Jun 2022 | 1916 Mcallister St | Robert Bernhard Coatings/Rbc Inc | misc dry rot repair back stairs & trim (less than 58%), back side of building. install approx 600 sf of siding west side of building. wood siding front half of wall visible from street. all work replaced in-kindDetails
misc dry rot repair back stairs & trim (less than 58%), back side of building. install approx 600 sf of siding west side of building. wood siding front half of wall visible from street. all work replaced in-kind | $20,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 719 Baker St | Robert Bernhard Coatings/Rbc Inc | vouluntary replace (e) post and beam system @ ground floorDetails
vouluntary replace (e) post and beam system @ ground floor | $7,000 |
| Mar 2, 2022 | Completed final sign-off Apr 2023 | 3330 Folsom St | Robert Bernhard Coatings/Rbc Inc | revision for pa #202201186169 to relocate powder room-first floor.Details
revision for pa #202201186169 to relocate powder room-first floor. | |
| Mar 2, 2022 | Completed final sign-off Apr 2023 | 3330 Folsom St | Robert Bernhard Coatings/Rbc Inc | remodel bathroom on 2nd floor; infill existing opening on property line w/ 1-hr rated wall; no structural workDetails
remodel bathroom on 2nd floor; infill existing opening on property line w/ 1-hr rated wall; no structural work | $27,500 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 719 Baker St | Robert Bernhard Coatings/Rbc Inc | remove and replace approx 500 sq ft of olis san francisco lap siding. remove and replace approx 30 sq ft of cracked concrete walkway in the breeze way. prime and paint the light well and breeze way. remove and replace approx 32 sq ft sheetrock in storage room.Details
remove and replace approx 500 sq ft of olis san francisco lap siding. remove and replace approx 30 sq ft of cracked concrete walkway in the breeze way. prime and paint the light well and breeze way. remove and replace approx 32 sq ft sheetrock in storage room. | $25,000 |
| Jan 18, 2022 | Completed final sign-off Aug 2022 | 3330 Folsom St | Robert Bernhard Coatings/Rbc Inc | remodel kitchen, replace in-kind. add led recessed lighting to living room, kitchen & dining room. replace 3 windows & 1 door. add a powder room to current living room area.Details
remodel kitchen, replace in-kind. add led recessed lighting to living room, kitchen & dining room. replace 3 windows & 1 door. add a powder room to current living room area. | $80,000 |
| Jan 14, 2022 | Completed final sign-off Jul 2022 | 851 14th St | Robert Bernhard Coatings/Rbc Inc | replacement of front stair.Details
replacement of front stair. | $70,000 |
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 2110 Baker St | Robert Bernhard Coatings/Rbc Inc | not visible from street: rear elevation siding replacement & dryrot repair. repair max 2 studs repair in kind.Details
not visible from street: rear elevation siding replacement & dryrot repair. repair max 2 studs repair in kind. | $70,000 |
| Sep 2, 2021 | Completed final sign-off Jan 2022 | 1307 Francisco St | Robert Bernhard Coatings/Rbc Inc | 1 wall to be removed to make 2 closets an office. replace (e) window in-kind.Details
1 wall to be removed to make 2 closets an office. replace (e) window in-kind. | $165,000 |
| Nov 19, 2020 | Expired or cancelled expired Oct 2023 | 118 Douglass St | Robert Bernhard Coatings/Rbc Inc | revision to no plan pa# 202011098521: to include dry rot repair and front stair support.Details
revision to no plan pa# 202011098521: to include dry rot repair and front stair support. | $10,000 |
| Nov 9, 2020 | Expired or cancelled expired Oct 2023 | 118 Douglass St | Robert Bernhard Coatings/Rbc Inc | stucco repair & dry rot/wood rot repair at front elevation. repair only - maximum of 50% of area. repair in like kind onlyDetails
stucco repair & dry rot/wood rot repair at front elevation. repair only - maximum of 50% of area. repair in like kind only | $20,000 |
| Mar 2, 2020 | Completed final sign-off Apr 2020 | 240 Laussat St | Robert Bernhard Coatings/Rbc Inc | dryrot repair at back of bldg. not visible from street. repair in kind at rear wall.Details
dryrot repair at back of bldg. not visible from street. repair in kind at rear wall. | $2,000 |
| Nov 4, 2019 | Completed final sign-off Apr 2020 | 450 Geary St | Robert Bernhard Coatings/Rbc Inc | administrative permit to memorialize paint colors per sf planning code.Details
administrative permit to memorialize paint colors per sf planning code. | |
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 243 Grattan St | Robert Bernhard Coatings/Rbc Inc | repair less than 10sf siding due to dry rott,reside rear elevation walls. replace 15 windows in rear elevation ohly. rebuild small staircase in-kind -less than 50%. to comply with complaint 201982701.Details
repair less than 10sf siding due to dry rott,reside rear elevation walls. replace 15 windows in rear elevation ohly. rebuild small staircase in-kind -less than 50%. to comply with complaint 201982701. | $100,000 |
| Jul 15, 2019 | Expired or cancelled cancelled Aug 2019 | 3953 Washington St | Robert Bernhard Coatings/Rbc Inc | replace foundations in lightwell onlyDetails
replace foundations in lightwell only | $5,000 |
| May 14, 2019 | Completed final sign-off Sep 2019 | 3951 Washington St | Robert Bernhard Coatings/Rbc Inc | repair dutch dormer: replace dilapidated siding in-kind with horizontal wood siding, repair facia boxes under gutters to match existing, repair framing of dormer as needed. replace siding in-kind with horizontal wood siding.Details
repair dutch dormer: replace dilapidated siding in-kind with horizontal wood siding, repair facia boxes under gutters to match existing, repair framing of dormer as needed. replace siding in-kind with horizontal wood siding. | $40,000 |
| May 14, 2019 | Completed final sign-off Sep 2019 | 3953 Washington St | Robert Bernhard Coatings/Rbc Inc | remove and replace 12 wood windows at rear with new wood windows in (e) openings. limited destructive testing and dry rot repair at front façade. u factor = 0.32 maxDetails
remove and replace 12 wood windows at rear with new wood windows in (e) openings. limited destructive testing and dry rot repair at front façade. u factor = 0.32 max | $40,000 |
| Mar 14, 2019 | Completed final sign-off Jul 2019 | 55 Benton Av | Robert Bernhard Coatings/Rbc Inc | pull front window due to dry rot and reinstall same front window. no changes.Details
pull front window due to dry rot and reinstall same front window. no changes. | $8,000 |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 1084 Shotwell St | Robert Bernhard Coatings/Rbc Inc | street spaceDetails
street space | |
| Oct 4, 2018 | Completed final sign-off Jul 2019 | 55 Benton Av | Robert Bernhard Coatings/Rbc Inc | proposed repair rebuild e damaged front entrance stairs in kind with existing bricksDetails
proposed repair rebuild e damaged front entrance stairs in kind with existing bricks | $8,000 |
| Jul 19, 2018 | Completed final sign-off Aug 2018 | 709 21st Av | Robert Bernhard Coatings/Rbc Inc | revision to bpa# 201806222749, revised stair framing underneath. no exterior work.Details
revision to bpa# 201806222749, revised stair framing underneath. no exterior work. | $300 |
| Jun 22, 2018 | Completed final sign-off Aug 2018 | 709 21st Av | Robert Bernhard Coatings/Rbc Inc | additional header detail on garage repair for 201805088464, repair lower portion of front entrance stairs in kind.Details
additional header detail on garage repair for 201805088464, repair lower portion of front entrance stairs in kind. | $1,500 |
| May 8, 2018 | Completed final sign-off Aug 2018 | 709 21st Av | Robert Bernhard Coatings/Rbc Inc | installation of new garage doorDetails
installation of new garage door | $2,810 |