Ralph Teyssier
- License
- S3727
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3727 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Simpson Gumpertz & Heger
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Dec 2005
1 permit since 2000 (engineer on 1 permit): 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Narrowback Construction Co.
- Architects
- Harvey Hacker
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2005 | Expired or cancelled expired Feb 2009 | 562 Sutter St | Narrowback Construction Co. | modernize (e) elevator installation. comply with all aspects of title 24 accessibility requirements except for cab size and door opening, which are constrained by limitations of (e) construction. replace lift mechanism, add seismic reinforcement to hoistway, and modify elevator penthouse to accommodDetails
modernize (e) elevator installation. comply with all aspects of title 24 accessibility requirements except for cab size and door opening, which are constrained by limitations of (e) construction. replace lift mechanism, add seismic reinforcement to hoistway, and modify elevator penthouse to accommod | $90,000 |